COSHH
Many processes involve the use of substances that could cause harm. The Control of Substances Hazardous to Health Regulations 2002 (COSHH) require employers to prevent or reduce workers' exposure to substances including:
- Chemicals, and products containing chemicals.
- Fumes, gases, vapours and mists.
- Dusts.
- Nanotechnology
- Biological agents and germs.
It does not include lead, asbestos or radioactive substances, which are controlled by other legislation.
There are a wide range of situations where workers might be exposed to substances hazardous to health:
- Dusty or fume-laden air in welding, quarries or woodworking.
- Metalworking fluids.
- Flowers, bulbs, fruit and vegetables.
- Wet working such as catering and cleaning.
- Wet cement in construction.
- Benzene in crude oil.
- Using substances such as paint, ink, glue, lubricants, detergent and beauty products.
See HSE: Control of Substances Hazardous to Health Essentials guidance publications for guidance on different types of substances that might be encountered. This includes guidance on silica, welding and metalworking, plant and machinery and does in fact include guidance about asbestos.
Workers might be be exposed by:
- Inhalation.
- Ingestion.
- Contact with the skin.
- Contact with the eyes.
- Skin puncture.
Controlling hazardous substances involves:
- Identifying potential health hazards.
- Undertaking risk assessments to determine how to prevent harm. If an employer has five or more employees they must record risk assessments, but it is sensible to do this even if there are fewer than five employees.
- Providing control measures, ensuring that they are in good working order and that they are used.
- Providing, replacing and paying for personal protective equipment (PPE).
- Where appropriate, providing monitoring to show compliance with Workplace Exposure Limits (WELs) or Biological Monitoring Guidance Values (BMGV) or to show that control equipment or personal protective equipment is working properly.
- Where appropriate, providing health surveillance.
- Emergency planning.
- Providing information, instruction and training so that employees understand; what the hazards and risks are, if there is an exposure limit, the results of any monitoring of exposure or health surveillance and what to do if there is an accident or emergency.
In the first instance, preventative measures should be taken to; avoid the substance or process, substitute it with something safer, or use the substance in a safer form. If exposure cannot be prevented, then it must be controlled to ensure that the risk of harm is ‘as low as is reasonably practicable' (ALARP).
Where proposed work has a high risk, a ‘permit to work’ may be introduced to ensure that only authorised people carry out the work, within a specified time frame and in a specific way, which may be set out in a method statement.
[edit] Related articles on Designing Buildings
- CDM.
- Competent person.
- Construction dust.
- Construction health risks.
- Contaminated land.
- Deleterious materials.
- Design risk management.
- Designing to reduce the chemical, biological and radiological vulnerability of new buildings (IP 7/15).
- Disposal.
- Hazardous substances.
- Health and safety file.
- Health and safety.
- Health and Safety Executive.
- Injuries on construction sites.
- Mastic asphalt flooring.
- Method statement.
- Occupational health.
- Personal protective equipment.
- Planning (Hazardous Substances) Act 1990.
- Pollution.
- Pre-construction information.
- Principal contractor.
- Registration, evaluation, authorisation and restriction of chemicals REACH.
- Reporting accidents and injuries on construction sites.
- Risk assessment.
- Site waste management plan.
- Volatile organic compounds.
- Workplace exposure limits.
- Work at height regulations.
[edit] External references
- The Control of Substances Hazardous to Health Regulations Legislation.
- HSE: COSHH.
- HSE: Control of Substances Hazardous to Health Essentials guidance publications.
- European Regulation (EC) No 1272/2008 on classification, labelling and packaging of substances and mixtures (CLP Regulations).
- Registration, Evaluation, Authorisation & Restriction of Chemicals (REACH)
Featured articles and news
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Comments