Build operate transfer BOT
[edit] Introduction
A build, operate and transfer (BOT) contract is a project delivery model that is typically used for large projects developed through Public Private Partnerships (PPPs). The term 'Public Private Partnerships' refers to a very broad range of partnerships in which the public and private sectors collaborate for some mutual benefit.
Under a BOT contract, a private organisation undertakes to complete a project, such as an infrastructure project, for which they are granted a concession to finance and build by a public sector partner, typically a government department. The public partner may provide limited funding or other benefits (such as tax exemptions) but the private organisation accepts most of the risks.
The private organisation is then granted the right to operate the project for a specific period of time and they receive a concession for that.
[edit] Applications
This form of arrangement is used in some parts of the United States and in other regions of the world.
One early example of the method is the China Hotel in Guangzhou, Guangdong, China. Completed in 1984, the five-star hotel was delivered under a DOT arrangement between the local Guangzhou municipal government and several foreign entities. It was the first venture with foreign investment and management in China.
One of the leading sources of funds on the project, Hopewell Holdings Ltd of Hong Kong, operated the property for a fixed period of time upon its completion. In 1998, Marriott took over management of the property through to 2018. After that point, the ownership and management of the hotel was taken over by Guangzhou Lingnan International Enterprise Group Co. Ltd.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.