The building regulations establish standards that must be achieved in the construction of buildings.
Part P of Schedule 1 to the Building Regulations requires that, ‘Reasonable provision shall be made in the design and installation of electrical installations in order to protect persons operating, maintaining or altering the installations from fire or injury.’
This applies to electrical installations intended to operate at low or extra-low voltage, that are:
- In or attached to a dwelling.
- In the common parts of a building serving one or more dwellings, but excluding lifts.
- In a building that receives its electricity from a source located within or shared with a dwelling.
- In a garden or in or on land associated with a building where the electricity is from a source located within or shared with a dwelling.
In order to meet this requirement, low voltage and extra-low voltage electrical installations in dwellings must be designed and installed to give appropriate protection against mechanical and thermal damage and not to present electric shock and fire hazards to individuals.
A series of Approved Documents set out what typically would be acceptable for compliance with the relevant requirements of Building Regulations. There is no legal obligation to follow the guidance in the Approved Documents.
Approved Document P - Electrical safety – Dwellings, describes methods for ensuring compliance with the electrical safety requirements for homes in relation to Part P of the Building Regulations. The most recent edition was published in January 2013 and came into effect in April 2013. It replaced Approved Document P (2006) which incorporated 2010 amendments. The main changes brought in by the 2013 edition included:
- A reduction in the range of the electrical installation work that is notifiable to a building control body.
- Installers not a registered a competent person are permitted to use a 'registered third-party certifier' to certify work, as an alternative to a using building control body.
- The technical guidance refers to BS7671:2008 Requirements for Electrical Installations, incorporating Amendment No 1:2011.
The content of the Approved Document includes:
- Section 1: Design and installation - There is a general requirement that electrical installations should be designed and installed in accordance with BS7671:2008.
- Section 2: Application of Part P – This section covers the types of buildings and installations that are covered by the Scope of Part P and the types of work that are notifiable and must be certified as complying with Building Regulations.
- Section 3: Certification, inspection and testing – Certification of notifiable installations is required, along with inspecting and testing in accordance with BS7671.
- Appendix A: Key terms.
- Appendix B: Standards referred to.
Parts A, B, C, E, F, L and M of the Building Regulations also contain provisions relating to electrical installations.
[edit] Related articles on Designing Buildings
- 2021 PRS electrical safety standards.
- Approved documents.
- Approved inspector.
- BS 7671.
- Building control body.
- Building notice.
- Building regulations.
- Competent person schemes.
- Electrical contractor.
- Electrical engineer.
- Electrical safety.
- Electrician.
- Glossary of electrical terms.
- Low voltage.
- Mechanical and electrical.
Featured articles and news
A transformative shift in the design, construction and management of built assets.
Apprenticeship announcement by the Prime Minister
Welcomed but with call for more actionable detail.
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach 7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.