External wall insulation (EWI) became notorious following the Grenfell Tower fire on 14 June 2017, when Celotex RS5000 thermal insulation was thought to have contributed to the rapid spread of the fire up the outside of the tower.
On 11 December 2017, the Department for Communities and Local Government issued Advice for building owners: External Wall Insulation (EWI) systems with a render or brick-slip finish.
The advice note was developed in consultation with the Department’s Independent Expert Advisory Panel and is intended for anyone responsible for the maintenance of buildings with EWI systems with either a render or brick-slip finish, particularly those over 18 m tall or in an exposed location.
The note states:
"Design calculations for EWI systems typically include safety factors to ensure that even where an installation is not perfect, or in the event that unusual circumstances occur (such as high winds), the system will remain safe... However, evidence submitted to Government suggests that in some circumstances these safety factors are being eroded by inadequate design (structural calculation methodologies) and / or poor installation."
"Where inadequate design and / or installation reduces safety factors, EWI systems are more vulnerable to: damage from high wind speeds; other installation defects such as poor water-tightness (which can lead to insulation becoming water-logged and heavier as a result); and variations in the design and installation quality of mechanical or adhesive fixings. These potential defects increase the risk of the EWI system becoming detached from the building and falling from height. This in turn poses risks to life safety. With render or brick-slip EWI systems there is a heightened risk of the render or brick-slip layer detaching from the insulation underneath where these defects are present."
Separate guidance, Advice note for external wall systems that do not incorporate ACM, was also published on 11 December.
[edit] Related articles on Designing Buildings Wiki
- ACM cladding.
- ACM cladding testing by BRE.
- Advice note for external wall systems that do not incorporate ACM
- Celotex RS5000 PIR insulation.
- Fire performance of external thermal insulation for walls of multistorey buildings, third edition (BR 135)
- Grenfell Tower articles.
- Grenfell Tower fire.
- Grenfell Tower independent expert advisory panel.
- Grenfell Tower Inquiry.
- Independent review of the building regulations and fire safety.
- Lakanal House fire.
- Rainscreen cladding.
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).