Advance payment bond for construction contracts
If the client agrees to make an advance payment (sometimes referred to as a down payment) to a supplier, a bond may be required to secure the payment against default by the contractor. This is referred to as an advance payment bond (APB), advance payment guarantee or advance stage payment.
For more information, see Advance payment.
Typically on a construction project an advanced payment bond will be required by the client if the contractor requests advance payment to help them meet significant start up or procurement costs that may have to be incurred before construction begins.
For example, where the contractor has had to purchase high-value plant, equipment or materials specifically for the project. The bond will protect the client in the event that the contractor fails to fulfil its contractual obligations, for example if the contractor becomes insolvent.
An advance payment bond will normally be an on-demand bond, meaning that the bondsman pays the amount of money set out in the bond immediately on demand, without any preconditions having to be met. This is as opposed to a a conditional bond (or default bond) where the bondsman is only liable if it has been established that there has been a breach of contract.
Advance payment bonds must be very carefully drafted to set out the circumstances for payment and to make clear that they are on-demand bonds.
A ‘vesting certificate’ or ‘certificate of vesting’ may be required from the contractor (or sub-contractors or suppliers), certifying that ownership of goods, plant or materials listed in a schedule will transfer from one party to the other upon payment and confirming that they will be properly identified, separately stored, insured and are free from encumbrances (such as retention of title).
For more information see: Vesting certificate.
[edit] Related articles on Designing Buildings
- Advance payment.
- Bid bond.
- Bonds in construction contracts
- Bonds and guarantees.
- Escrow.
- Materials on site.
- Off-site goods and materials.
- Off-site goods and materials - legal issues.
- On-demand bond.
- Parent company guarantee.
- Performance bond.
- Retention.
- Retention bond.
- Vesting certificate.
- Wuhan Guoyu Logistics Group Co Ltd & Anr v Emporiki Bank of Greece SA.
- Zero-coupon bond.
[edit] External references
- Rainy Sky S.A. v Kookmin Bank.
Featured articles and news
Heat pump announcements, what homeowners need to know
An 'ultimate guide to heat pumps' from a heating company.
Construction contract awards reach £7.1bn in February
Their highest level in seven months.
The journey to sustainability in heritage
Research is the key to better understanding.
Heritage approaches to adaptation, mitigation and loss.
Bridging the gap between policy, finance and installation.
Development on brownfield land
Definition, background, policy and the latest consultation.
With the Design Framework for Building Services.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, measures and the roles involved.
ECA joins HSE campaign to support mental health
Working Minds’ five simple steps based on risk assessment.
Mental health in the construction industry
Mental health issues in brief with related articles.
Transitional arrangements, Building Control and the BSR.
For pre-October buildings with substantial progress by April.
How to write an inspection and test plan
ITPs for quality control and assurance particular elements.
Why quality counts in domestic ventilation systems
From products, to systems to the installation.
Empowering the Future with CIOB Academy
Lifelong learning, upscaling, and reskilling for the built environment.
Winners of the 2024 ASBP Awards
Project, Product and Initiative according to the 6 pillars.
Comments