Window and door schedules
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information, and so on. Schedules may be appended to other documents, such as contracts.
Window and door schedules are a convenient way of presenting complex information about the different door and window sizes and types that are specified on the contract documents to ensure proper installation. Drawings may refer to window and door schedules by use of a code corresponding to a door or window type on the schedule.
A door schedule is a document, which has all the information a joiner will require in selecting the correct door for a designated position, as well as the correct ironmongery that has to be fitted to each door
Typical information contained on a door schedule might include:
- Code number (which corresponds with the drawings).
- Name.
- Style.
- Number required.
- Size (width, height, thickness).
- Material.
- Composition.
- Colour and finish.
- Style of hardware.
- Hinges, locks, handles, push plates, pull handles, kicker plates, vision panels, stops, closers and so on.
- Weight.
- Fire rating.
- Acoustic rating.
- Manufacturer.
- Product series.
- Other remarks.
Schedules may also include a simple elevation illustrating the overall composition of the door or window.
Building information modelling (BIM) software may allow door and window schedules to be generated automatically.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).