Window and door schedules
In its broadest sense, the term ‘schedule’ simply refers to a list. That can be a list of items, activities, events, information, and so on. Schedules may be appended to other documents, such as contracts.
Window and door schedules are a convenient way of presenting complex information about the different door and window sizes and types that are specified on the contract documents to ensure proper installation. Drawings may refer to window and door schedules by use of a code corresponding to a door or window type on the schedule.
A door schedule is a document, which has all the information a joiner will require in selecting the correct door for a designated position, as well as the correct ironmongery that has to be fitted to each door
Typical information contained on a door schedule might include:
- Code number (which corresponds with the drawings).
- Name.
- Style.
- Number required.
- Size (width, height, thickness).
- Material.
- Composition.
- Colour and finish.
- Style of hardware.
- Hinges, locks, handles, push plates, pull handles, kicker plates, vision panels, stops, closers and so on.
- Weight.
- Fire rating.
- Acoustic rating.
- Manufacturer.
- Product series.
- Other remarks.
Schedules may also include a simple elevation illustrating the overall composition of the door or window.
Building information modelling (BIM) software may allow door and window schedules to be generated automatically.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.
Demolition and retrofit approaches in Planning Policy
MHCLG demolition and retrofit survey to inform future updates to national planning policy.
Expert taskforce to spearhead new, new town generation
Sir Michael Lyons given 12 months for recommendations.
Government policy statement on new towns
A coded vision for a new generation of new towns.