Vessel, New York
Contents |
[edit] Designs
In September 2016, British architect-designer Thomas Heatherwick unveiled the first renderings of a new public monument for New York City.
Vessel is a sculpture standing 15-storeys high, consisting of 154 intricately interconnecting flights of stairs. Sitting in a public plaza and gardens, it will form the centrepiece of west Manhattan’s new Hudson Yards development, the city’s largest urban development since the Rockefeller Center in the 1930s.
Heatherwick said Vessel’s lattice was inspired by the geometries of Indian stepwells, and is made up of almost 2,500 individual steps and 80 landings. Weighing 600 tons, each layer of the hexagonal structure becomes wider, from a 15 m (50 ft) diameter at the base to 46 m (150 ft) at the top, forming a conical shape.
The structural steel frame will be clad in a polished copper-coloured steel skin, providing warped reflections of the plaza below.
Vessel’s cost has escalated from the original budget of $75m to an estimate of $150m. Some of the elements are currently under construction in Italy but are not to be assembled on site until 2017.
Heatherwick said: “My studio was commissioned to design a centrepiece for an unusual new piece of land in New York. In a city full of eye-catching structures, our first thought was that it shouldn’t just be something to look at. Instead we wanted to make something that everybody could use, touch, relate to.
“When I was a student, I fell in love with an old discarded flight of wooden stairs outside a local building site. It caught my imagination and I loved that is was part furniture and part infrastructure. You could climb up stairs, jump on them, dance on them, get tired on them and then plonk yourself down on them.
“Years later, suddenly here was an opportunity to make a new kind of landmark for Hudson Yards. We wondered whether it could be built entirely from steps and landings?”
[edit] Construction
In April 2017, construction officially began on Vessel. 75 individual units are to be prefabricated by Cimolai S.p.A in their Italian facility before being shipped to New York and assembled on site.
Ten pieces were already in New York as of April, with the remainders being scheduled to arrive and be assembled over the course of 2017.
In December 2017, Vessel topped out after eight months of construction, well ahead of its scheduled opening along with the whole Public Square and Gardens in autumn of 2018.
Over the course of 2018, the final mechanical and safety components will be installed, as well as the surrounding landscaping designed by designed by Nelson Byrd Woltz Landscape Architects in collaboration with Heatherwick Studio.
Upon completion, the public square will house more than 8,000 plants and 200 mature trees, including a wide variety of woodland plants and perennial gardens, as well as a 200 ft-long fountain that will mirror the flow of a river.
Thomas Heatherwick said:
“Vessel is one of the most complex pieces of steelwork ever made. Today we are marking the exciting moment when the last of the enormous 75 pre-fabricated pieces which travelled all the way from Italy to Manhattan, has been assembled ahead of schedule and with astonishing geometric accuracy. Over the next few months we’ll focus on installing the final details of the structure, as its paving, balustrades, lighting and cladding come together to complete this different kind of public space.”
Images and content courtesy of Forbes Massie-Heatherwick Studio.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.