Scope of work
The Association for Project Management describes ‘scope’ as ‘The totality of outputs, outcomes and benefits and the work required to produce them’ and ‘scope management’ as ‘The process whereby outputs, outcomes and benefits are identified, defined and controlled’.
In construction, the term ‘scope of work’ (sometimes described as a ‘scope of works’, ‘statement of work’ or 'terms of engagement') is a very general, and sometimes ambiguous term referring to a general description of the work that is expected to be performed under a particular contract. It may be prepared by the client or their consultants and included in tender documentation for construction works.
The nature of the scope of work can vary significantly from project to project. Sometimes it will simply offer a very broad description of the works required, whilst sometimes it provides a complete description of the project, significant milestones, a programme of work with the expected time frames for delivery, reports, pricing, deliverables, roles and responsibilities and end products that are to be provided.
For more information, see What should be included in a scope of work?
A scope of work can be a useful way of agreeing broad project requirements for both the client and supplier. However, errors or inconsistencies with other contract documentation can lead to confusion and uncertainties which are often cited as a cause of disputes on construction projects.
It is common for changes to be required to the scope of work after the contract has been awarded. Most forms of contract make provisions for the contract administrator to instruct reasonable variations which may give rise to additions or deductions from the contract sum, however, these variations must not change the nature of the works themselves. In some cases, the works may be tendered before the scope of work is known in detail. In this case, provisional sums may be included in the contract, or flexible procurement routes adopted such as measurement contracts or prime cost contracts.
The term ‘scope of work’ is generally used to refer to construction activities, however, a ‘scope of services’ which describes the services a consultant will be performing on a project may also sometimes be referred to as a scope of work.
Confusingly, the term ‘scope of work’ can also used interchangeably with the term ‘schedule of work’. However, a schedule of work has a more specific meaning, referring to 'without quantities' instructional lists often produced on smaller projects or for alteration work as an alternative to bills of quantities, allowing the pricing of items such as builders work and fixing schedules.
[edit] Related articles on Designing Buildings Wiki.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.