Tender cost
[edit] introduction
Usually created as a response to an invitation to tender (ITT), a tender is a submission made by a prospective supplier (the tenderer) which makes an offer for the supply of goods or services. In construction terms the tender could be for the construction of an entire building or buildings, or for providing a distinct set of services such as landscaping.
A tender pricing document sets out the way in which the cleint wishes to review the breakdown of the overall tender prices provided by tendering suppliers. It is effectively an unpriced bill of quantities. The completed tender pricing document is effectively a priced bill of quantities; it sets out the tenderer’s rates, costs and totals and constitutes the tenderer’s complete offer to the client.
The tender cost is the total of all the charges contained in the tender that will be made by the supplier associated with the delivery of the tender requirements. To the client (who issued the ITT), the tender cost usually represents the total cost of taking delivery of the building or service.
Costs in the tender will be broken down and itemised against each stated requirement. This not only makes it easier for tenderers to price the document, it also means clients and their advisers can see exactly what is being offered by the various tenderers, make comparisons between them, see where value lies and where savings can be made.
[edit] Two-stage tendering
Two-stage tendering is used to allow early appointment of a supplier, prior to the completion of all the information required to enable them to offer a fixed price. In the first stage, a limited appointment is agreed allowing the supplier to begin work and in the second stage a fixed price is negotiated for the contract. It can be used to appoint the main contractor early or more commonly as a mechanism for early appointment of a specialist supplier such as a cladding contractor.
[edit] Related articles on Designing Buildings Wiki
- Accounting.
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Business plan.
- Cash flow.
- Common arrangement of work sections.
- Contract sum.
- Contract sum analysis.
- Cost consultant.
- Cost plan.
- Elemental cost plan.
- Initial cost appraisals.
- New Rules of Measurement.
- Pre-tender estimate.
- Spon's Price Book.
- Tender documentation.
- Tender pricing document
- Types of bill of quantities.
- Whole-life costs.
Featured articles and news
50th Golden anniversary ECA Edmundson apprentice award
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.