Tender cost
[edit] introduction
Usually created as a response to an invitation to tender (ITT), a tender is a submission made by a prospective supplier (the tenderer) which makes an offer for the supply of goods or services. In construction terms the tender could be for the construction of an entire building or buildings, or for providing a distinct set of services such as landscaping.
A tender pricing document sets out the way in which the cleint wishes to review the breakdown of the overall tender prices provided by tendering suppliers. It is effectively an unpriced bill of quantities. The completed tender pricing document is effectively a priced bill of quantities; it sets out the tenderer’s rates, costs and totals and constitutes the tenderer’s complete offer to the client.
The tender cost is the total of all the charges contained in the tender that will be made by the supplier associated with the delivery of the tender requirements. To the client (who issued the ITT), the tender cost usually represents the total cost of taking delivery of the building or service.
Costs in the tender will be broken down and itemised against each stated requirement. This not only makes it easier for tenderers to price the document, it also means clients and their advisers can see exactly what is being offered by the various tenderers, make comparisons between them, see where value lies and where savings can be made.
[edit] Two-stage tendering
Two-stage tendering is used to allow early appointment of a supplier, prior to the completion of all the information required to enable them to offer a fixed price. In the first stage, a limited appointment is agreed allowing the supplier to begin work and in the second stage a fixed price is negotiated for the contract. It can be used to appoint the main contractor early or more commonly as a mechanism for early appointment of a specialist supplier such as a cladding contractor.
[edit] Related articles on Designing Buildings Wiki
- Accounting.
- Approximate quantities cost plan.
- Bills of quantities.
- Budget.
- Business plan.
- Cash flow.
- Common arrangement of work sections.
- Contract sum.
- Contract sum analysis.
- Cost consultant.
- Cost plan.
- Elemental cost plan.
- Initial cost appraisals.
- New Rules of Measurement.
- Pre-tender estimate.
- Spon's Price Book.
- Tender documentation.
- Tender pricing document
- Types of bill of quantities.
- Whole-life costs.
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).