Reassembly
Re is a Latin prefix meaning anew or again (as well as back or against), so reassembly simply means to put something together again.
In more technical construction terms PAS 1192-2:2013: Specification for information management for the capital/delivery phase of construction projects using building information modelling (BIM), defines assembly as: 'Group of components or types to enable the reuse of standardised design or specification elements improving productivity of design and delivery as well as providing a location to hold specifications and lessons learnt in a simple and useable way. They may hold benchmark data for cost and carbon impacts. The contents of assemblies may themselves have attributes and classifications. These properties may include key data which is attached (to the object) for use once it is placed into a model and may include cost, CO2, programme, maintenance and other key information.'
So reassembly might mean to put elements of a building together again, for example where the frame of a building might have been pre-assembled in the workshop, then disassembled before being delivered to site only to be reassembled in situ permanently.
In the case of putting something together again a new it may refer to reclaiming, reusing or repurposing materials in relation ot the circular economy, such as a demolished log house being reassembled in the garden as a sauna.
[edit] Related articles on Designing Buildings
- Assembly area.
- Assembly and recreation definition.
- Assembly building.
- Assembly drawing.
- Building information modelling.
- BIM volume.
- Building component.
- Component.
- Custom build home.
- Design for deconstruction.
- Design for Manufacture and Assembly (DfMA).
- Disassembly.
- Factory-made housing.
- Flat pack.
- Kit house.
- Exploded view.
- Joint v connection.
- Modular buildings.
- Modern methods of construction.
- Part.
- Pre-assembly.
- Off-site construction.
- Off-site prefabrication of buildings: A guide to connection choices.
- Open source architectural plans for modular buildings.
- Plug and play skyscrapers.
- Pod.
- Precast.
- Prefabricated structural panels.
- Prefab bungalows.
- Prefabrication.
- Pre-manufactured value.
- Volumetric modular construction.
- Volumetric unit.
- Self-assembly.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.