Public transport accessibility levels
The London Plan, published by the Mayor of London in March 2016, suggests that public transport accessibility levels (PTALs) are: ‘…a detailed and accurate measure of the accessibility of an area to the public transport network, taking into account walk access time and service availability.’
It suggests that PTALs reflect:
- Walking time from the area of interest to the public transport access points.
- The reliability of the service modes available.
- The number of services available within the catchment.
- The level of service at the public transport access points - i.e. average waiting time.
PTALs do not consider:
- The speed or utility of accessible services.
- Crowding, including the ability to board services.
- Ease of interchange.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.




















