Feasibility studies for construction projects
Contents |
[edit] What are feasibility studies?
Feasibility studies are preliminary investigations undertaken in the very early stage of a project to assess whether the project is viable. They tend to be carried out when a project is relatively large or complex, or where there is some doubt or controversy regarding the proposed development.
[edit] What is the purpose of feasibility studies?
The purpose of feasibility studies is to:
- Establish whether the project is viable.
- Help identify a range of feasible options.
- Begin the process of preparing other project documentation such as a clarifying the business need, formulating a business case, scoping a project execution plan and strategic brief and so on.
[edit] What might a feasibility study include?
On large, complex or controversial projects, there may be a number of different feasibility studies carried out for different aspects of the project, for different purposes, or for different possible solutions. These might require different skills, and could consider issues such as:
- The likelihood and ease of obtaining planning permission.
- The likelihood that an environmental impact assessment will be required.
- Other legal/statutory approvals that might be required.
- Analysis of the budget relative to client requirements.
- Assessment of the potential to re-use existing facilities or doing nothing rather than building new facilities.
- Assessment of any existing site information that is available.
- Initial site appraisals, including geotechnical studies, assessment of any contamination, availability of services, uses of adjoining land, easements and restrictive covenants, environmental impact, and so on.
- Considering different solutions to accessing potential sites.
- Analysis of accommodation that might be included or excluded.
- Assessment of the possible juxtaposition of accommodation.
- The preparation of basic stacking diagrams.
- Assessing operational and maintenance issues.
- Appraisal of servicing strategies.
- Programme considerations.
- Procurement options.
Feasibility studies are not part of the design process, they are assessments of viability, potential opportunities and constraints.
Various stakeholders, statutory authorities and other third parties may need to be consulted in the preparation and assessment of feasibility studies. The assessments carried out should be presented in a structured way so the client can decide whether or not to proceed to the next stage. Wherever possible, any information prepared or obtained should be in a format which can be readily shared and used, and should be stored and named in a way consistent with the long-term project and operational needs.
[edit] What happens after feasibility studies?
After assessing the feasibility studies, the client will decide whether to proceed to the next stage and if so, which options should be developed in more detail. Ideally there will be no more than four options at this stage. If more options exist it may be necessary to carry out further high-level studies before proceeding to more detailed options appraisals.
Options appraisals assess and compare a number of potential options before developing a concept design for the preferred option. Options appraisals might include diagrammatic options studies that enable the client to understand the broad pros and cons of the available options so that a preferred option can be selected.
For more information see: Options appraisals.
[edit] Related articles on Designing Buildings
- Briefing documents.
- Business case.
- Client requirements.
- Concept.
- Concept design.
- Constraints.
- Development appraisal.
- Environmental Impact Assessment.
- Options review report.
- Planning permission.
- Site appraisals.
- Site information.
- Spatial diagram.
- Stacking diagram.
- Statutory approvals.
- Strategic brief.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.


























Comments
To make a comment about this article, click 'Add a comment' above.
Separate your comments from any existing comments by inserting a horizontal line.