[edit] Use of the term
The term structural opening (SO), sometimes also called rough opening, refers to the size of an opening in a wall or facade where a window or door or other unit will be installed. It is normally slightly larger than the actual unit size to allow for tolerances in construction. Structural openings are called this such because their edges generally meet with structural elements of the building such as columns, walls, beams, lintels and so on.
[edit] Finished opening
The term finished opening (FO) is similar to structural opening in that it is the opening that will house a unit such as a window in a facade or wall. Although in this case the opening may have been prepared in some way rather than being a raw structural opening, for instance with fixing of plywood boxing, plaster or render between the structural element and the location of the window or other unit.
[edit] Tolerances
The width of a structural opening to the edge of brick and blockwork might be 910mm, the finished opening may have a lining of 10mm creating a finished opening that is 900mm wide, whilst the unit size that is intended to be installed is 890mm wide, leaving <5mm tolerance on all sides.
NHBC guidance 9.1.4 Doors and windows discusses appropriate tolerances of <3mm on one side to the other of an opening: "Doors and windows shall be installed to appropriate tolerances, including openings in walls and external openings viewed from the inside."
[edit] Thermal performance
It should be noted that a window or any unit installed into a structure can have an impact on fabric performance, as the opening punctuates the building fabric from inside to outside. Psi ( or ψ value) denotes heat loss over a given length rather than a given area. The thermal performance of a window should be calculated including an adjustment for the interface between the window unit and the structural or finished opening, this installation adjustment is often known as the window or installation Psi (ψw). It is an adjustment to the thermal performance of a window allowing for heat loss along the linear junction between the installed window and the edge of the opening.
[edit] Related articles on Designing Buildings
- Elements of structure in buildings
- Principles of enclosure.
- Structure.
- Structural systems.
- Superstructure.
- Types of structure.
- Types of door.
- Windows.
[edit] External references
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.