Getting a skip hire permit
In construction, a skip is a container used to hold waste and debris produced by works such as building, demolition, landscaping, and so on. Hiring a skip can be an important part of site waste management and efficient waste disposal.
For more information, see Hiring a skip.
Skip hire permits, also known as a skip licences, are required if a skip needs to be placed on a public highway. They are generally issued by local authorities. A permit is not required if the skip is placed on private land. Permits are also required for hippobags and other skip bags.
If a skip is to be placed in a controlled parking zone (i.e. on a single yellow line, a resident’s parking bay, or a pay and display parking bay), a parking suspension will also be required.
It may be necessary to put safety lights and markings on or around skips, such as; reflective markings, traffic cones, night-time safety lamps and the name and telephone number of the skip hire company. Failure to do so can result in a fine of up to £1,000.
Skips must not block access to property or apparatus within the highway, restrict visibility at junctions, accesses and crossing points or reduce highway widths to an unacceptable extent.
Applicants may be required to indemnify the local authority against liability, loss, claims and other proceedings and may be required to have public liability insurance cover.
The charge for skip hire permits varies according to the local authority and the amount of time it will be needed for. Parking bay suspension fees are an additional charge, which also vary depending on the local authority. The typical cost of a skip permit is £20 to £60 a week. If the skip operator applies for a permit on the client’s behalf, which the majority of councils allow, they will often add a mark-up to cover admin costs. Councils will usually issue permits for 1-2 weeks, after which they can be extended at an additional charge.
Both a skip hire permit and parking suspension typically take 3-4 days to arrange.
If permits are not obtained, skips can be removed and a penalty charged.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding.
Types of rapidly renewable content
From forestry to agricultural crops and their by-products.
Terraced houses and the public realm
The discernible difference between the public realm of detached housing and of terraced housing.