Indemnity clauses in design and construction contracts
An indemnity clause in a contract allocates risk for claims or for loss or damage between the parties to the contract, so that if one party suffers a loss, the other party will reimburse them. Indemnities are primary obligations that remain even if the contract is set aside.
Indemnity clauses are commonly used on construction projects to allocate risk between; the client and contractor, the client and consultants or the contractor and sub-contractors. In complex contracting situations indemnity clauses may run throughout the contractual chain.
Construction contracts may, for example, include a clause requiring the contractor to indemnify the client against expense, liability, loss or claim in respect of personal injury or death of any person arising out of the works. Or they may require the contractor to indemnify the client against breaches of contract such as non-payment of statutory fees. In addition, designers appointment agreements may include an indemnity in respect of claims for breach of professional duty.
Typically, designers are required to hold professional indemnity insurance to cover such a liability and this requirement is now increasingly asked of contractors with design responsibilities. (See Legal indemnities for a list of other situations where insurance can indemnify against losses).
Performance bonds and parent company guarantees may also include indemnity clauses requiring the surety to indemnify the client against default by the contractor.
The precise consequences of an indemnity clause will depend on its wording and how it is read in relation to the rest of the contract. One particular area where differences can be significant is whether a clause requires an indemnity only against losses caused by the party providing the indemnity, whether they exclude negligence on the part of the indemnitee, or whether they cover all losses no matter how they were caused. For example, a professional indemnity insurance policy is not dependent on allocating blame to the indemnifier.
Because of these differences, and in order to accurately define the extent of losses covered, indemnity clauses require very precise drafting, and due to complex case law they are becoming increasingly detailed. It is important therefore that the parties to a contract read indemnity clauses carefully and fully understand the obligation they are agreeing to.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.
Women's Contributions to the Built Environment.
Calls for the delayed Circular Economy Strategy
Over 50 leading businesses, trade associations and professional bodies, including CIAT, and UKGBC sign open letter.
The future workforce: culture change and skill
Under the spotlight at UK Construction Week London.
A landmark moment for postmodern heritage.
A safe energy transition – ECA launches a new Charter
Practical policy actions to speed up low carbon adoption while maintaining installation safety and competency.
Frank Duffy: Researcher and Practitioner
Reflections on achievements and relevance to the wider research and practice communities.
The 2026 Compliance Landscape: Fire doors
Why 'Business as Usual' is a Liability.
Cutting construction carbon footprint by caring for soil
Is construction neglecting one of the planet’s most powerful carbon stores and one of our greatest natural climate allies.
ARCHITECTURE: How's it progressing?
Archiblogger posing questions of a historical and contextual nature.
The roofscape of Hampstead Garden Suburb
Residents, architects and roofers need to understand detailing.
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.