Self-build home: Find a plot
Find potential plots.
Finding a suitable plot (or property for conversion) is one of the biggest challenges for self-builders as demand generally exceeds supply. It might involve:
- Advertising.
- Registering with estate agents, land agents and local authorities.
- Using online search sites such as PlotBrowser and Rightmove.
- Offering a finder’s fee to property professionals.
- Joining a self-build forum.
- Considering land or property owned by family members.
- Approaching owners of land designated for residential use in local development plans.
- Analysing aerial photography and large-scale maps which might reveal potential infill plots, such as; large back gardens, waste ground or brownfield sites.
- Poorly built, low-value properties that might be worth purchasing for their land value.
Be aware that there are a number of scams that attempt to exploit people looking for self-build plots. Always keep in mind the phrase ‘buyer beware’. If it sounds too good to be true, then it probably is.
Assess potential plots.
In considering different potential plots, it is important to assess:
- Compatibility with the requirements set out in the brief.
- The likelihood that planning permission will be granted, including possible objections from interested parties. Some sites are offered with outline planning permission, and without this, or detailed planning permission, the site may not be a developable plot. Proceeding with such a plot is taking a risk that the vendor did not consider worthwhile. However, plots with permission in place are likely to be more expensive.
- The date of any planning consent. Construction of a development must begin within three years of a planning approval, and reserve matters applications (applications giving details following an outline planning permission) must be made within three years of the outline approval.
- The planning history of the plot.
- Uses of adjoining land.
- Future developments planned in the area that might impact on the proposed plot.
- The connectivity of the location in terms of; transport links, access to schools, shops and other amenities.
- The exact legal boundaries of the plot.
- Ease of access onto the plot, both for construction vehicles and once the home is complete.
- Site orientation relative to the sun, views, prevailing wind and so on.
- Land topography, levels and flood risk.
- Availability or proximity of utilities. The cost of bringing utilities to a site will depend on the distance from existing connections and can be very expensive.
- Price in relation to the budget, including stamp duty land tax.
- Legal complexities, such as listed buildings, conservation areas, boundary disputes, party walls, easements, restrictive covenants, tree preservation orders and so on. See Technical due diligence for more information.
- The presence of protected species such as great crested newts or controlled species such as Japanese knotweed which can delay developments and incur significant costs.
- Obstructions such as old foundations which may need to be removed.
- Whether there is any contaminated land.
- The suitability of ground conditions for supporting a building and for landscaping.
- The possible layout of accommodation on the site.
- The likely value of the completed development.
Featured articles and news
Regulator of Social Housing publishes latest fire safety report
Covering remediation of 11 metre plus social housing sector buildings.
Apartment and Duplex Defects Remediation Bill 2024
Approved for priority drafting by Government of Ireland.
The long list with in the frame of key historical events.
Competence frameworks for sustainability in the built environment
Code of practice, core criteria consultation draft for comment.
UK Net Zero Carbon Buildings Standard Sept update
Pilot version for testing and feedback on its adoption due.
New Floods Resilience Taskforce
With a wet met office autumn prediction.
National Retrofit Hub takeover of Net Zero stage
At Birmingham UK Construction Week in October.
AT Awards 2024 finalists announced
With more to come, prior to the Awards ceremony in October.
London construction cools as hotspots appear nationally
Increases in the East of England, Yorkshire and Scotland.
ARB proposals for a new Architects Code
Announced in the shadow of the final Grenfell Inquiry report.
Combining human creativity and tech innovation now and in the future
Building automation and control systems market study
BSRIA 2024 North America BACS software & services.
Impact of digital technology on productivity in construction
New CIOB academy guidance for companies of all sizes.
Demolition and retrofit approaches in Planning Policy
MHCLG demolition and retrofit survey to inform future updates to national planning policy.
Expert taskforce to spearhead new, new town generation
Sir Michael Lyons given 12 months for recommendations.
Government policy statement on new towns
A coded vision for a new generation of new towns.