[edit] Introduction
On 19 January 2021, the Nationally Significant Infrastructure Project (NSIP) reached its 100th decision. The approval was made on behalf of the A1 Birtley to Coalhouse Improvement Scheme.
“This is a significant milestone, particularly bearing in mind the challenges posed by working through three separate lockdown periods in the last 12 months,” says Sarah Richards, Chief Executive of The Planning Inspectorate. “We have had to change how we work over the past few months and have done so with great success. We are aware that we have to keep evolving and challenging ourselves as an organisation in order to keep improving,” she added.
[edit] Eligible projects
NSIPs are usually large-scale developments such as new harbours, power generating stations (including wind farms) and electricity transmission lines which require development consent under procedures governed by the Planning Act 2008 (as amended). These projects are not only significant in their importance to the country but are large applications of particular interest to many local people. Of the 100 projects decided as of January 2021, 61 were related to energy, 36 transport, two waste and one waste water.
The nationally significant decisions made under the Planning Act 2008 are evaluated based on a streamlined process that provides fairer and faster outcomes for communities and developers. Prior to the introduction of the 2008 Act, it could take several years to decide major planning applications. Under the Act, there are strict timescales imposed on key stages of the process, and it typically takes 14 to 16 months from the day an application is submitted to a decision being made.
[edit] Approval process
The 2008 Act sets out thresholds above which certain types of infrastructure development are considered to be nationally significant and require development consent. In England, the Planning Inspectorate examines applications for development consent from the energy, transport, waste, waste water, water and business and commercial sectors. In Wales, it examines applications for energy and harbour development, subject to detailed provisions in the Act; other matters are for Welsh Ministers.
The Planning Inspectorate places great importance on being fair, open and impartial. No matter the type, size or location of a project, it ensures that local communities have the opportunity to make their views known and are able to participate in the examination process. The examinations of projects to date considered thousands of written representations and examiners have heard directly from thousands of affected people at Hearings held in the locality of the projects.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.