Local listed building consent order
The designation of ‘listed building’ places special controls on the demolition, alteration or extension of buildings, objects or structures of particular architectural or historic interest. Demolition, alteration or extension of a listed building in a way that is likely to affect its special architectural or historical interest is only allowed with listed building consent.
Local planning authorities can grant Local Listed Building Consent Orders which grant a general listed building consent order for works that alter or extend certain listed buildings in their area (demolition works are not included). This means that owners or developers do not need to apply for repeat listed building consent for works that are covered by the order. They are likely to be used for groups of similar or related listed buildings in multiple ownership, for example, estate villages or terraced houses.
This is different to a Listed Building Heritage Partnership Agreement (LBHPA), which is an agreement between a local planning authority and the owner of a listed building, or group of buildings, which grants listed building consent for types of works (alterations or extensions) to the building(s) for the duration of the agreement.
The duration of a Local Listed Building Consent Order is determined by the local planning authority. Within the Order, the land and buildings to which the Order relates is defined along with details of what type of works are covered. It is recommended that a record (written and photographic) is kept of any works undertaken to assist the local planning authority with monitoring the Order.
Under the Planning (Local Listed Building Consent Orders) (Procedure) Regulations 2014, owners and any other interested parties must be provided with an opportunity to comment on a draft Order. The consultation period will be for a minimum of 28 days. Historic England (formerly English Heritage) must also be consulted on any draft Order relating to Grade I or II* buildings, or any building that is owned by the local planning authority.
Once the Order is adopted, it is recommended that regular reviews are undertaken to ensure that it remains fit for purpose. The local planning authority must prepare annual reports whilst the order is in place.
[edit] Related articles on Designing Buildings
- Are works to listed buildings demolition or alteration?
- Historic England.
- IHBC responds to Review of the Mission and Pastoral Measure 2011.
- Listed building.
- Listed building consent order.
- Listed building heritage partnership agreement.
- Locally listed building.
- Mission and Pastoral Measure 2011.
- Planning permission.
- Port Sunlight's local listed building order.
[edit] External references
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.


















Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.