Local listed building consent order
The designation of ‘listed building’ places special controls on the demolition, alteration or extension of buildings, objects or structures of particular architectural or historic interest. Demolition, alteration or extension of a listed building in a way that is likely to affect its special architectural or historical interest is only allowed with listed building consent.
Local planning authorities can grant Local Listed Building Consent Orders which grant a general listed building consent order for works that alter or extend certain listed buildings in their area (demolition works are not included). This means that owners or developers do not need to apply for repeat listed building consent for works that are covered by the order. They are likely to be used for groups of similar or related listed buildings in multiple ownership, for example, estate villages or terraced houses.
This is different to a Listed Building Heritage Partnership Agreement (LBHPA), which is an agreement between a local planning authority and the owner of a listed building, or group of buildings, which grants listed building consent for types of works (alterations or extensions) to the building(s) for the duration of the agreement.
The duration of a Local Listed Building Consent Order is determined by the local planning authority. Within the Order, the land and buildings to which the Order relates is defined along with details of what type of works are covered. It is recommended that a record (written and photographic) is kept of any works undertaken to assist the local planning authority with monitoring the Order.
Under the Planning (Local Listed Building Consent Orders) (Procedure) Regulations 2014, owners and any other interested parties must be provided with an opportunity to comment on a draft Order. The consultation period will be for a minimum of 28 days. Historic England (formerly English Heritage) must also be consulted on any draft Order relating to Grade I or II* buildings, or any building that is owned by the local planning authority.
Once the Order is adopted, it is recommended that regular reviews are undertaken to ensure that it remains fit for purpose. The local planning authority must prepare annual reports whilst the order is in place.
[edit] Related articles on Designing Buildings
- Are works to listed buildings demolition or alteration?
- Historic England.
- IHBC responds to Review of the Mission and Pastoral Measure 2011.
- Listed building.
- Listed building consent order.
- Listed building heritage partnership agreement.
- Locally listed building.
- Mission and Pastoral Measure 2011.
- Planning permission.
- Port Sunlight's local listed building order.
[edit] External references
Featured articles and news
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.

























Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.