Inspection clause
An inspection clause is a provision included in a construction contract that outlines the rights and responsibilities related to the inspection of the work being carried out. This clause ensures that the quality and progress of the construction work can be monitored and assessed at various stages of the project. The clause grants the client, their representatives, or designated third parties the right to inspect the construction work at specified intervals or upon request. This helps ensure that the work is being carried out in accordance with the contract specifications, standards, and regulations.
Standard form contracts in the UK, such as those from the Joint Contracts Tribunal (JCT) or the New Engineering Contract (NEC), typically include detailed inspection clauses tailored to the specific needs of the project.
The clause may specify a schedule or particular stages at which inspections will take place. These stages often include key milestones in the project, such as foundation completion, structural framing, and final finishing. The contractor may be required to provide advance notice to the client or inspector before certain stages of work are completed, allowing inspections to be scheduled in a timely manner without causing delays. The clause usually guarantees inspectors reasonable access to the construction site and the necessary facilities to conduct thorough inspections. This includes access to relevant documentation, drawings, and safety equipment.
The clause may define the standards and criteria against which the work will be inspected. This often includes adherence to building regulations, and the specific requirements outlined in the contract documents. If defects or non-compliance issues are identified during an inspection, the clause will typically outline the process for documenting these issues, notifying the contractor, and rectifying the defects. This might include time frames for addressing the issues and the process for re-inspection.
Inspection results can influence payment schedules. For instance, if defects are found, payments may be withheld or adjusted until the issues are resolved. The clause may also outline the process for resolving disputes that arise from inspection findings, such as involving an independent third-party inspector or arbitrator.
The clause often includes provisions for a final inspection before the handover of the project. This ensures that all work has been completed to the client's satisfaction and meets the contractual requirements.
[edit] Related articles on Designing Buildings
- Approved inspector.
- BREEAM Testing and inspecting building fabric.
- Building Control Performance Standard 6: Site inspection.
- Building regulations inspection.
- Defects.
- Health and safety inspector.
- Inspection.
- Opening up works for inspection and testing.
- Quality control.
- Remedial work.
- Schedule of defects.
- Snagging.
- Statutory Compliance Inspection Checklist.
- Technical inspection.
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.