Advance notice
In the context of a construction contract, the term "Advance Notice" might refer to a requirement for a formal notification given by one party to the other party about certain events or actions that are anticipated to occur. The notice is usually required within a specific timeframe before the event or action takes place. The purpose of such notices is to ensure that all parties are adequately informed and can prepare, thereby minimising disruptions and misunderstandings.
Examples include:
- The contractor may need to provide advance notice to the client or the project manager about the planned start date of construction activities.
- If there are any proposed changes to the work, the contractor must provide advance notice to the client. This allows the client to review and approve the changes, and to make any necessary adjustments to the budget or timeline.
- Advance notice might be required if the contractor needs access to certain parts of the construction site at specific times, particularly if this access might disrupt the client's operations or other activities on site.
- Notification about the delivery of large or critical materials and equipment might need to be given in advance to ensure proper coordination and storage.
- Advance notice is often required for inspections or testing of completed work. This allows the client or their representative to be present and ensure that the work meets the specified standards.
- Providing advance notice of key project milestones or completion dates helps in coordinating subsequent phases of work and ensures that all parties are aware of the project timeline.
The specific requirements for advance notice, including the timeframe and method of notification, are typically outlined in the contract terms and conditions. Adhering to these notice requirements is crucial for maintaining good communication and avoiding potential disputes.
See also: Notice.
[edit] Related articles on Designing Buildings
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.