Advance notice
In the context of a construction contract, the term "Advance Notice" might refer to a requirement for a formal notification given by one party to the other party about certain events or actions that are anticipated to occur. The notice is usually required within a specific timeframe before the event or action takes place. The purpose of such notices is to ensure that all parties are adequately informed and can prepare, thereby minimising disruptions and misunderstandings.
Examples include:
- The contractor may need to provide advance notice to the client or the project manager about the planned start date of construction activities.
- If there are any proposed changes to the work, the contractor must provide advance notice to the client. This allows the client to review and approve the changes, and to make any necessary adjustments to the budget or timeline.
- Advance notice might be required if the contractor needs access to certain parts of the construction site at specific times, particularly if this access might disrupt the client's operations or other activities on site.
- Notification about the delivery of large or critical materials and equipment might need to be given in advance to ensure proper coordination and storage.
- Advance notice is often required for inspections or testing of completed work. This allows the client or their representative to be present and ensure that the work meets the specified standards.
- Providing advance notice of key project milestones or completion dates helps in coordinating subsequent phases of work and ensures that all parties are aware of the project timeline.
The specific requirements for advance notice, including the timeframe and method of notification, are typically outlined in the contract terms and conditions. Adhering to these notice requirements is crucial for maintaining good communication and avoiding potential disputes.
See also: Notice.
[edit] Related articles on Designing Buildings
Featured articles and news
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Preserving, waterproofing and decorating buildings.
Many resources for visitors aswell as new features for members.
Using technology to empower communities
The Community data platform; capturing the DNA of a place and fostering participation, for better design.
Heat pump and wind turbine sound calculations for PDRs
MCS publish updated sound calculation standards for permitted development installations.
Homes England creates largest housing-led site in the North
Successful, 34 hectare land acquisition with the residential allocation now completed.
Scottish apprenticeship training proposals
General support although better accountability and transparency is sought.
The history of building regulations
A story of belated action in response to crisis.
Moisture, fire safety and emerging trends in living walls
How wet is your wall?
Current policy explained and newly published consultation by the UK and Welsh Governments.
British architecture 1919–39. Book review.
Conservation of listed prefabs in Moseley.
Energy industry calls for urgent reform.
Heritage staff wellbeing at work survey.
A five minute introduction.
50th Golden anniversary ECA Edmundson apprentice award
Showcasing the very best electrotechnical and engineering services for half a century.
Welsh government consults on HRBs and reg changes
Seeking feedback on a new regulatory regime and a broad range of issues.