Advance notice
In the context of a construction contract, the term "Advance Notice" might refer to a requirement for a formal notification given by one party to the other party about certain events or actions that are anticipated to occur. The notice is usually required within a specific timeframe before the event or action takes place. The purpose of such notices is to ensure that all parties are adequately informed and can prepare, thereby minimising disruptions and misunderstandings.
Examples include:
- The contractor may need to provide advance notice to the client or the project manager about the planned start date of construction activities.
- If there are any proposed changes to the work, the contractor must provide advance notice to the client. This allows the client to review and approve the changes, and to make any necessary adjustments to the budget or timeline.
- Advance notice might be required if the contractor needs access to certain parts of the construction site at specific times, particularly if this access might disrupt the client's operations or other activities on site.
- Notification about the delivery of large or critical materials and equipment might need to be given in advance to ensure proper coordination and storage.
- Advance notice is often required for inspections or testing of completed work. This allows the client or their representative to be present and ensure that the work meets the specified standards.
- Providing advance notice of key project milestones or completion dates helps in coordinating subsequent phases of work and ensures that all parties are aware of the project timeline.
The specific requirements for advance notice, including the timeframe and method of notification, are typically outlined in the contract terms and conditions. Adhering to these notice requirements is crucial for maintaining good communication and avoiding potential disputes.
See also: Notice.
[edit] Related articles on Designing Buildings
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.