Advance notice
In the context of a construction contract, the term "Advance Notice" might refer to a requirement for a formal notification given by one party to the other party about certain events or actions that are anticipated to occur. The notice is usually required within a specific timeframe before the event or action takes place. The purpose of such notices is to ensure that all parties are adequately informed and can prepare, thereby minimising disruptions and misunderstandings.
Examples include:
- The contractor may need to provide advance notice to the client or the project manager about the planned start date of construction activities.
- If there are any proposed changes to the work, the contractor must provide advance notice to the client. This allows the client to review and approve the changes, and to make any necessary adjustments to the budget or timeline.
- Advance notice might be required if the contractor needs access to certain parts of the construction site at specific times, particularly if this access might disrupt the client's operations or other activities on site.
- Notification about the delivery of large or critical materials and equipment might need to be given in advance to ensure proper coordination and storage.
- Advance notice is often required for inspections or testing of completed work. This allows the client or their representative to be present and ensure that the work meets the specified standards.
- Providing advance notice of key project milestones or completion dates helps in coordinating subsequent phases of work and ensures that all parties are aware of the project timeline.
The specific requirements for advance notice, including the timeframe and method of notification, are typically outlined in the contract terms and conditions. Adhering to these notice requirements is crucial for maintaining good communication and avoiding potential disputes.
See also: Notice.
[edit] Related articles on Designing Buildings
Featured articles and news
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.