Fused spur
A fused spur is an electrical supply accessory that incorporates a fuse. This fuse, with a lower rating than the fuse for a ring man, allows an electrical supply using one feed cable to a socket to be taken off a ring main.
Fused spurs are commonly used as an alternative to a conventional socket, for the installation of powerful electrical appliances that can be installed without a plug, such as ovens, washing machines, electric heaters, dishwashers, fridges, and so on. For safety and maintenance purposes, these sorts of appliances may require installation on a separate cable from the ring main.
Switched fused spurs include a manual on/off switch, while unswitched fused spurs do not.
| |
|
| switched fused spur | electrical symbol for switched fused spur |
A variation is a double pole fused spur switch which incorporates an extra isolation feature. This makes the switch safer to use as it separates the live and neutral wires.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.






















Comments
So if the building is being let this should not stop the tenant replacing the fuse?