The march towards cleaner and more sustainable energy has impacted supplies of 'fly ash' to the construction industry. In this article, Nigel Cooke from the UK Quality Ash Association (UKQAA) proposes some alternatives.
Contents |
[edit] Introduction
Pulverised fuel ash (PFA) is the fine ash produced during the combustion process used at coal-fired power stations.
When finely ground coal is burned the fine ash is carried out with the flue gas and is sometimes referred to as 'fly ash'. The ash passes through electrostatic precipitators that remove these fine particles from the gas stream where it is stored in silos or hoppers.
It has played a major role in many construction products and construction applications for the past 50 years.
However, all coal fired power is expected to cease by 2025 and securing sources of PFA throughout the year is already becoming harder, resulting in the need for imports and extraction from temporary stock piles.
PFA is collected from the silos and can either be sold dry for use in concrete and applications such as aerated concrete blocks or wetted (called conditioning) for applications such as fill, grouts, etc. Any excess ash has traditionally been mixed with large quantities of water and pumped to lagoons or conditioned and sent to landfill. Both lagoon and landfill ash can be recovered and sold for fill, grouting and other applications.
[edit] What impact will dwindling supply have?
Securing future supply and safeguarding existing assets is now becoming urgent.
Some may be aware of the pozzolanic benefits of using PFA in concrete, which enhances chemical resistance and durability as well as producing more pumpable mixes. However, some might also be less aware that some 1.5 million tonnes a year of PFA is used in the manufacture of aerated concrete blocks and grouts for mine filling and ground stabilisation.
Blast furnace slag can be substituted for PFA in concrete though prices of slag are increasing and sourcing is becoming more difficult with some slag being imported from as far away as China. Sand can replace PFA in the manufacture of aerated concrete blocks and for grouting though the performance of sand in such applications is not as good as PFA. Moreover, sand is also becoming a scarce commodity.
[edit] UKQAA’s proposed solution
It is estimated that there are well in excess of 50m tonnes of PFA currently deposited in landfill sites in the UK and managed as a waste. UKQAA is seeking to redefine such deposits as future 'pozzolanic reserves' that could be adopted under future minerals plans. This would then allow the UK construction industry to secure such reserves as a 'national asset' for future extraction for use in cementitious and non-cementitious applications.
UKQAA recognises that a considerable amount of work is required to align all the various stakeholders to redefine PFA landfill deposits as pozzolanic reserves.
This article was originally published here by ICE on 29 May 2018. It was written by Nigel Cooke, UKQUAA.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Comments
"sand is also becoming a scarce commodity" is an interesting statement. The UK is blessed with large quantities of marine sand reserves which are managed by The Crown Estate to minimise environmental damage associated with extraction. I agree that in some countries sand may be a scarce commodity, but, after conducting a regional material flow analysis of all stone, sand and gravel reserves in the UK we estimated the marine sand resource to be in excess of 50 billion tonnes. With less than 15% of the licensed area currently being dredged and around 16 million tonnes being removed on an annual basis the UK still has plenty of sand!