Exceptional circumstances
Exceptional circumstances refer to events outside of the control of a particular party, also referred to a extenuating circumstances and extraordinary circumstances or sometimes unexpected exceptional circumstances. Although in general the latter two are used to describe events that negatively impact a contract or project, exceptional circumstances is most often used in the same context but could also be used to describe positive impacts on a construction project. For example exceptional circumstances meant the contractors were able to complete the project earlier than planned, exceptional weather allowed us to continue working into the winter months. These examples are however relatively rare and as such the description below mainly covers negative impacts of construction projects or the ability of staff to carry out their duties.
The term may be used in relation to force majeure, although also related to events beyond the reasonable control of a party, which prevent or impede their ability to perform their obligations under a contract, force majeure maybe be a more significant and contractual occurrence. Generally these cannot be event that a party could reasonably have avoided or overcome, or one attributable to the other party. The term may also be used in relation frustration in construction contracts, though again this generally has greater significance and impact because it leads to the contract being terminated without either party being considered to be in breach.
The term exceptional or extenuating circumstances tends to be used as a reasoning for a particular outcome, so rendering the conduct less serious or potentially lead to reduced damages. It is most commonly used in relation to employment but it important o note that extenuating circumstances under employment law are likely to differ from those that may be considered under a building contract.
In most cases it is a complex interpretable subject in any context. For example serious medical issues with staff maybe presented as extenuating circumstances to be considered, however within a building contract, it could be responded to that the impacts on the project may have been avoided, if other staff had been made available. Unless many staff became unavailable, due to for example a pandemic.
It is common in some cases for examples of extenuating circumstances to be given within the contract itself to avoid confusion. Here are some examples of what might be considered as extenuating circumstances, though they would have to be agreed ideally before and if not after the event.
- Medical issues (including mental health/wellbeing)
- Death of relatives
- Personal problems
- Personal or Family issues, such as divorce
- Period of self-isolation/quarantine
- Caring responsibilities and domestic difficulties
- Religious Observances
- Pregnancy related conditions
[edit] Related articles on Designing Buildings
- Breach of contract.
- Clear contracts during uncertain times.
- Compensation event.
- Concurrent delay.
- Consequential loss.
- Coronavirus and force majeure.
- Exigency.
- Extension of time.
- Force majeure.
- Frustration.
- frustration in construction contracts.
- Loss and expense.
- Liquidated damages.
- Neutral event.
- Relevant event.
- Suspension of performance.
- Termination in construction contracts.
- Variations.
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.