Exceptional circumstances
Exceptional circumstances refer to events outside of the control of a particular party, also referred to a extenuating circumstances and extraordinary circumstances or sometimes unexpected exceptional circumstances. Although in general the latter two are used to describe events that negatively impact a contract or project, exceptional circumstances is most often used in the same context but could also be used to describe positive impacts on a construction project. For example exceptional circumstances meant the contractors were able to complete the project earlier than planned, exceptional weather allowed us to continue working into the winter months. These examples are however relatively rare and as such the description below mainly covers negative impacts of construction projects or the ability of staff to carry out their duties.
The term may be used in relation to force majeure, although also related to events beyond the reasonable control of a party, which prevent or impede their ability to perform their obligations under a contract, force majeure maybe be a more significant and contractual occurrence. Generally these cannot be event that a party could reasonably have avoided or overcome, or one attributable to the other party. The term may also be used in relation frustration in construction contracts, though again this generally has greater significance and impact because it leads to the contract being terminated without either party being considered to be in breach.
The term exceptional or extenuating circumstances tends to be used as a reasoning for a particular outcome, so rendering the conduct less serious or potentially lead to reduced damages. It is most commonly used in relation to employment but it important o note that extenuating circumstances under employment law are likely to differ from those that may be considered under a building contract.
In most cases it is a complex interpretable subject in any context. For example serious medical issues with staff maybe presented as extenuating circumstances to be considered, however within a building contract, it could be responded to that the impacts on the project may have been avoided, if other staff had been made available. Unless many staff became unavailable, due to for example a pandemic.
It is common in some cases for examples of extenuating circumstances to be given within the contract itself to avoid confusion. Here are some examples of what might be considered as extenuating circumstances, though they would have to be agreed ideally before and if not after the event.
- Medical issues (including mental health/wellbeing)
- Death of relatives
- Personal problems
- Personal or Family issues, such as divorce
- Period of self-isolation/quarantine
- Caring responsibilities and domestic difficulties
- Religious Observances
- Pregnancy related conditions
[edit] Related articles on Designing Buildings
- Breach of contract.
- Clear contracts during uncertain times.
- Compensation event.
- Concurrent delay.
- Consequential loss.
- Coronavirus and force majeure.
- Exigency.
- Extension of time.
- Force majeure.
- Frustration.
- frustration in construction contracts.
- Loss and expense.
- Liquidated damages.
- Neutral event.
- Relevant event.
- Suspension of performance.
- Termination in construction contracts.
- Variations.
Featured articles and news
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherit assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.