ECA call for case studies of Net Zero Carbon work
The climate emergency is changing the way we live. By delivering the changes, electrotechnical firms are essential to achieving Net Zero Carbon.
The Electrical Contractors Association Members are seizing opportunities to create a cleaner world. ECA supports the skills and technologies crucial to reaching Net Zero Carbon in the UK by 2050 and is looking for examples of innovation and good practice in low carbon installation from across its Membership.
Note that case studies will only be accepted if accompanied by the name and contact details of the person submitting the case study. If it is intended to publish the case study approval will be sought on the final version, as case studies may be edited for brevity and consistency.
Invitations are open to submit case studies from ECA members to [email protected], using the simple template which can be downloaded here.
Please submit case studies in word format.
The case study should be:
- A demonstration of low-carbon electrotechnical and/or engineering services work, or
- A demonstration of corporate social responsibility (CSR) policy in practice, with measurable outcomes.
ECA works closely with its Members, industry partners and Government to help Britain transition to Net Zero Carbon. We produce regular guidance notes, technical bulletins, and industry updates to keep Members at the forefront of the Net Zero transition. Learn more here.
This article appears on the ECA news and blog site as "Call for case studies: Net Zero Carbon Work" dated May 31, 2023.
--ECA
[edit] Related articles on Designing Buildings
- Achieving net zero in social housing.
- Actuate UK issues climate warning and urges action.
- Aligning net zero with the levelling-up agenda.
- A zero-carbon UK by 2050?
- Carbon footprint.
- Carbon negative.
- Carbon neutral.
- Case study.
- Construction reports.
- Climate Change Act.
- Construction skills crisis threatens UK net zero goals.
- CO2nstruct Zero programme grows to over 70 businesses.
- Fabric first investigation into net zero for existing buildings.
- Half of public sector bodies not planning for net zero carbon.
- Heat pumps and heat waves: How overheating complicates ending gas in the UK.
- Infrastructure carbon reduction misses net-zero target.
- Low or zero carbon technologies.
- Making Mission Possible: report on achieving a zero-carbon economy by 2030.
- Nearly zero-energy building.
- Net Zero All Party Parliamentary Group NZ APPG.
- Net zero by 2050.
- Net zero (whole life) carbon.
- Net zero carbon building.
- Net zero carbon emissions.
- Net zero strategy: build back greener.
- Planning the infrastructure transition to net-zero.
- Research in the construction industry.
- Scotland publishes plans to reach net zero targets with Heat in Buildings Strategy.
- Skilled workforce unable to meet net zero ambitions.
- Smoothing the path to net zero.
- Thermal imaging of the building fabric in the net zero world.
- Transform to Net Zero.
- Use case.
Featured articles and news
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.
Picking up the hard hat on site or not
Common factors preventing workers using head protection and how to solve them.
Building trust with customers through endorsed trades
Commitment to quality demonstrated through government endorsed scheme.
New guidance for preparing structural submissions for Gateways 2 and 3
Published by the The Institution of Structural Engineers.
CIOB launches global mental health survey
To address the silent mental health crisis in construction.
New categories in sustainability, health and safety, and emerging talent.
Key takeaways from the BSRIA Briefing 2024
Not just waiting for Net Zero, but driving it.
The ISO answer to what is a digital twin
Talking about digital twins in a more consistent manner.
Top tips and risks to look out for.
New Code of Practice for fire and escape door hardware
Published by GAI and DHF.
Retrofit of Buildings, a CIOB Technical Publication
Pertinent technical issues, retrofit measures and the roles involved.
New alliance will tackle skills shortage in greater Manchester
The pioneering Electrotechnical Training and Careers Alliance.
Drone data at the edge: three steps to better AI insights
Offering greater accuracy and quicker access to insights.
From fit-out to higher-risk buildings.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.