Cooling off period
A 'cooling off period' is a length of time during which the purchaser of goods or services has the right to cancel the purchase and obtain a refund.
The Consumer Rights Directive came into force in 2014, to clarify cancellation rights. It harmonised the cooling off period for goods and services sold by distance or off-premises to 14 days from the date of delivery. This means that a purchaser is able to cancel and get a refund within 14 days if they arranged the purchase by phone, online, by mail order or somewhere else outside their business.
It also makes certain contracts void in circumstances where the contract has been made in the purchaser’s home or place of business and a cooling off period has not been given. If a business does not provide details of how to cancel, the cooling off period is extended by 14 days from the date on which they are eventually received.
However, a purchaser does not automatically get a cooling off period if they have requested something that needs to be specially-made, such as windows, or if it relates to urgent repairs or maintenance.
For goods that are ordered, the cooling off period begins:
- The day after the delivery is made, if a single item (or several items delivered in one go) is ordered.
- The day after the last item is delivered if a one-off order is placed for items that will have a spread-out delivery.
- The day after the first delivery if an order is placed for several, spread-out deliveries of the same items.
As long as works have not begun, a purchaser can cancel the contract within 14 days. If the purchaser requested for the works to begin during the cooling off period then part of the agreed price will have to be paid, depending on how much has been completed at the time of the request to cancel. If the works are begun during the cooling off period without the purchaser’s approval, the purchaser will have the right to cancel with a full refund of costs.
NB Property Factors (Scotland) Act 2011, Code of Conduct for Property Factors, Laid before the Scottish Parliament by the Scottish Ministers under Section 14 of the Property Factors (Scotland) Act 2011 in January 2020, defines a cooling off period as: ‘A set period of time after an arrangement is agreed between homeowners and a property factor during which the homeowners can terminate the contract without incurring any penalty notice that may apply.’
[edit] Related articles on Designing Buildings Wiki
- Advice from CIAT about the cancellation of consumer contracts.
- Breach of contract.
- Construction contract.
- Consumer Code for Home Builders.
- Consumer Contracts Regulations.
- Consumer rights act 2015.
- Contract conditions.
- Fair payment practices.
- Payment for extra work.
- Reservation agreement.
- Right to payment.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.






















Comments