Barrage
The Barmby tidal barrage is shown at the point where the Derwent meets the Ouse. The barrage was constructed in 1974 to prevent tidal water entering the Derwent and causing flooding. |
Contents |
[edit] Introduction
The International Levee Handbook, published by CIRIA in 2013, defines barrage as a: "Structure built in an estuary with the specific intention of preventing, or in some way modifying, tidal propagation.”
[edit] Types of barrages
[edit] Tidal barrage
A barrage may also be referred to as an estuary barrier or coastal barrier. It may be constructed to assist with irrigation or it can generate hydroelectricity by harnessing tidal power. These types of barrages may be referred to as tidal barrages.
[edit] Barrage dam
Barrages that are used as diversion dams (sometimes referred to as barrage dams) may be controlled by gates that are opened or closed in order to control water levels. The gates are constructed between piers that are used to control the load and pressure of the contained water.
Barrage dams are frequently constructed near the mouth of large, winding rivers. They are generally built on flat terrain.
Barrage dams primarily divert water and tend to raise water levels by relatively small amounts (such as one metre). Unlike conventional dams, they do not hold large amounts of water in reservoirs.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.