Building performance evaluation of occupied and operational buildings
In 2021 British Standards Institute launched BS 40101:2021 the first British Standard on evaluating building performance.
This standard has been updated in 2022 for BS 40101:2022, with it complete title being; "Building performance evaluation of occupied and operational buildings (using data gathered from tests, measurements, observation and user experience). Specification."
BSRIA (Building Services Research and Information Association) define Building Performance Evaluation (BPE) as:
“…a form of Post-Occupancy Evaluation (POE) which can be used at any point in a building's life to assess energy performance, occupant comfort and make comparisons with design targets.”
In their blog about the new standard BSI describes how the standard is set-up in simple terms, the what, why, when, how and who of building performance evaluation.
"BS 40101:2022 has a simple aim: it gives guidance on how to evaluate building performance. But this is a complicated area. Thus the standard covers the what, why, when, how and who of building performance evaluation.
“What” relates to what needs to be tested or evaluated depending on the physicality of the property, the performance parameters of interest and the reason or reasons for the evaluation. Which brings users neatly on to “why” evaluate performance in the first place. This must be determined. Is it to verify performance or measure performance before or after improvement works? To investigate suspected underperformance or to inform the design of a new building or building type? The standard also gives guidance on tracking performance over time, e.g. for annual reporting or periodic building MOT's.
“When” is another question that needs to be answered. Evaluation activities may be conducted before works, “in process”, at completion of works, or 6-12 months after completion. They may be triggered by construction stages, a prescribed timetable, to aid the specification of other building(s) and/or if performance concerns are raised by occupants, users or other stakeholders.
Next is “how” the evaluation should be conducted and escalated if required – including ongoing adoption of new methods, technologies and techniques. The standard also prescribes the accuracy, granularity and format in which test and measurement data should be captured and held.
Finally “who” outlines the expertise required to conduct and interpret evaluation activities and to take responsibility for checking the relevant performance parameters and investigating any underperformance found to identify the root cause.
The standard also takes account of building occupants/operators and occupation patterns including density, both in evaluating that the building performance is fit for purpose in respect of its occupants and occupation and in incorporating occupant (user) feedback and insights to identify and help investigate performance concerns. "
For further reading and a link to the new British Standard follow this link.
[edit] Related articles on Designing Buildings
- Building performance evaluation.
- Building performance evaluation in non-domestic buildings guide – an introduction to the tests and methods in non-domestic buildings
- Building performance metrics.
- Building use studies (BUS).
- CIOB Building Performance and Evaluation Guide.
- Closing the gap between design and as-built performance.
- Defects liability period.
- Design quality indicator DQI.
- End of contract report.
- Energy performance certificates.
- Extended aftercare.
- Initial aftercare.
- Maintenance.
- Migration strategy.
- Occupation.
- Performance gap.
- Performance in use (starter article that repeats some of the text in this article).
- Post occupancy evaluation process.
- Post opening project evaluation.
- Post project review (starter article that repeats some of the text in this article).
- Soft landings.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.