Building manual
The RIBA Plan of Work 2020, suggests that a building manual is: ‘A summary of all key information about a building, including the Health and Safety File and Fire Safety Information, which are regulatory requirements. The Building Manual is used to ensure that Asset Management and Facilities Management are effectively implemented and might contain tasks that the users must consider in order to get the most out of the building.’
The RIBA Plan of Work 2020 suggests that building manuals (which may have been referred to as building owner's manuals, or operation and maintenance manuals) were traditionally been prepared to satisfy statutory requirements and were large, unwieldy and often poorly structured volumes that were difficult to for the client to use.
The Inclusive Design Overlay to the RIBA Plan of Work published by the RIBA in 2023, states: ‘The Building Manual helps to ensure that operations and maintenance activities are effectively implemented. It includes a summary of all key information about a building, including the Health and Safety File and Fire Safety Information, which are regulatory requirements and might contain tasks that the users must consider to get the most out of the building.’
Security Overlay to the RIBA Plan of Work, published by the RIBA in 2023, states: ‘The Building Manual should contain details of how measures included in the Security Strategy are incorporated into the Building Systems and how these will be operated at RIBA Stage 7, which might be outlined in the Security Plan. The Security Strategy might be included as an appendix to the Building Manual to provide useful decision-making information to users.’
Digital building manuals can provide structured links to information about the products and systems used in a development and information about maintenance, replacements and so on.
Ideally, the client should define what they want to be in the building manual other than statutory requirements.
[edit] Related articles on Designing Buildings
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.






















