A break clause is a provision in a construction contract that allows one or both parties (typically the client or the contractor) to terminate the contract before the completion of the project under certain agreed-upon conditions. The inclusion of a break clause provides a legal means for ending the contractual relationship without being considered in breach of contract.
The inclusion of a break clause provides flexibility and protection for both parties. For clients, it offers an exit strategy if the project no longer meets their needs or if they encounter financial difficulties. For contractors, it provides a means to exit the project if there are significant issues that hinder their ability to complete the work as planned.
The break clause specifies the conditions under which it can be exercised. These conditions might include a notice period, specific dates when the clause can be activated, or particular events that trigger the clause (such as failure to meet project milestones, significant changes in project scope, or unforeseen circumstances).
The party wishing to exercise the break clause must typically provide written notice to the other party within a specified period, as outlined in the contract. This notice period allows the other party to prepare for the termination and to mitigate any potential losses.
The contract may stipulate compensation or penalties that apply if the break clause is exercised. This might include payment for work completed up to the termination date, reimbursement for materials ordered but not yet used, demobilization costs, or a lump-sum payment to cover any inconvenience or financial loss caused by the early termination.
Upon activation of the break clause, both parties must adhere to the rights and obligations set out in the contract. This includes settling any outstanding payments, handing over completed work, returning any equipment or materials, and ensuring that the site is left in a safe and secure condition.
The contract may include provisions for resolving any disputes that arise from the activation of the break clause. This could involve mediation, arbitration, or litigation, depending on the terms agreed upon by the parties.
[edit] Related articles on Designing Buildings
Featured articles and news
Ebenezer Howard: inventor of the garden city. Book review.
The Grenfell Tower fire, eight years on
A time to pause and reflect as Dubai tower block fire reported just before anniversary.
Airtightness Topic Guide BSRIA TG 27/2025
Explaining the basics of airtightness, what it is, why it's important, when it's required and how it's carried out.
Construction contract awards hit lowest point of 2025
Plummeting for second consecutive month, intensifying concerns for housing and infrastructure goals.
Understanding Mental Health in the Built Environment 2025
Examining the state of mental health in construction, shedding light on levels of stress, anxiety and depression.
The benefits of engaging with insulation manufacturers
When considering ground floor constructions.
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.