Break clauses in construction contracts
A break clause is a provision in a construction contract that allows one or both parties (typically the client or the contractor) to terminate the contract before the completion of the project under certain agreed-upon conditions. The inclusion of a break clause provides a legal means for ending the contractual relationship without being considered in breach of contract.
The inclusion of a break clause provides flexibility and protection for both parties. For clients, it offers an exit strategy if the project no longer meets their needs or if they encounter financial difficulties. For contractors, it provides a means to exit the project if there are significant issues that hinder their ability to complete the work as planned.
The break clause specifies the conditions under which it can be exercised. These conditions might include a notice period, specific dates when the clause can be activated, or particular events that trigger the clause (such as failure to meet project milestones, significant changes in project scope, or unforeseen circumstances).
The party wishing to exercise the break clause must typically provide written notice to the other party within a specified period, as outlined in the contract. This notice period allows the other party to prepare for the termination and to mitigate any potential losses.
The contract may stipulate compensation or penalties that apply if the break clause is exercised. This might include payment for work completed up to the termination date, reimbursement for materials ordered but not yet used, demobilization costs, or a lump-sum payment to cover any inconvenience or financial loss caused by the early termination.
Upon activation of the break clause, both parties must adhere to the rights and obligations set out in the contract. This includes settling any outstanding payments, handing over completed work, returning any equipment or materials, and ensuring that the site is left in a safe and secure condition.
The contract may include provisions for resolving any disputes that arise from the activation of the break clause. This could involve mediation, arbitration, or litigation, depending on the terms agreed upon by the parties.
[edit] Related articles on Designing Buildings
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.