Advantages of shell and core
The concept of shell and core (or base build) is that the developer builds the base building (the shell and core), and fit out works are left to be completed by tenants to their own specification before the building is occupied. Shell and core originated in the USA where it was used for office buildings that were built for rent by developers. Rosehaugh/Stanhope introduced a similar idea in the UK in its ground-breaking Broadgate development in the City of London.
For more information see: Shell and core.
There are several advantages to the shell and core method:
- It can speed up the design and build process considerably, which can generate cost savings. It allows progress to be made in the design of portions of the building which will be fitted out later while the items of the shell and core that have a longer lead time (i.e. structures, façade and so on), are being constructed. This allows work to proceed without delays waiting for details of the interiors to be finalised.
- It creates a blank canvas for occupants, making it more flexible, without impacting on the the main fabric of the building.
- It avoids waste as it is less necessary for occupants to strip out existing fittings.
- It can result in more energy-efficient buildings, as the typically concrete core creates a thermal mass that enhances heat storage potential of the building.
- From the perspective of the end user, shell and core is particularly beneficial as it can result in a finish more suited to their needs. The ‘blank canvas’ of the building enables the end user to better align it to their individual requirements and there can be more time to develop proposal.
- The underlying flexibility of the design means it is generally more straight forward for subsequent occupants to change the interior fit out.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.