User contributions
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
- 06:29, 5 March 2020 (diff | hist) Party Wall Act
- 06:28, 5 March 2020 (diff | hist) Institute of party wall surveyors
- 06:27, 5 March 2020 (diff | hist) Institute of party wall surveyors
- 06:21, 5 March 2020 (diff | hist) Talk:Construction materials (Blanked the page)
- 06:20, 5 March 2020 (diff | hist) m Construction methods (Reverted edits by [IP address hidden] (talk) to last revision by Designing Buildings)
- 16:33, 4 March 2020 (diff | hist) Procurement route
- 16:32, 4 March 2020 (diff | hist) Procurement strategy
- 16:29, 4 March 2020 (diff | hist) Procurement strategy
- 16:17, 4 March 2020 (diff | hist) In use
- 16:12, 4 March 2020 (diff | hist) Handover of the construction site to the client
- 16:08, 4 March 2020 (diff | hist) Manufacturing and construction
- 16:06, 4 March 2020 (diff | hist) N Manufacturing and construction (Created page with "The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress r...")
- 16:02, 4 March 2020 (diff | hist) Spatial coordination
- 15:31, 4 March 2020 (diff | hist) News from the web
- 15:28, 4 March 2020 (diff | hist) Technical design stage for building projects
- 15:26, 4 March 2020 (diff | hist) N Spatial coordination (Created page with "The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress r...")
- 15:21, 4 March 2020 (diff | hist) RIBA Plan of Work 2020
- 15:21, 4 March 2020 (diff | hist) Strategic definition stage for building projects
- 15:20, 4 March 2020 (diff | hist) Preparation and briefing
- 15:17, 4 March 2020 (diff | hist) N Preparation and briefing (Created page with "The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress r...")
- 15:11, 4 March 2020 (diff | hist) Strategic definition stage for building projects
- 14:57, 4 March 2020 (diff | hist) In use
- 14:55, 4 March 2020 (diff | hist) Developed design
- 14:52, 4 March 2020 (diff | hist) Handover and close out
- 14:52, 4 March 2020 (diff | hist) Handover and close out
- 14:51, 4 March 2020 (diff | hist) Developed design
- 14:50, 4 March 2020 (diff | hist) RIBA Plan of Work 2020
- 14:47, 4 March 2020 (diff | hist) N RIBA Plan of Work 2020 (Created page with "The RIBA Plan of Work is published by the Royal Institute of British Architects (RIBA). Split into a number of key project stages, the RIBA Plan of Work provides a shared framewo...")
- 14:16, 4 March 2020 (diff | hist) Preparation and brief project stage
- 14:02, 4 March 2020 (diff | hist) Construction industry acronyms - H
- 14:01, 4 March 2020 (diff | hist) Joint Competent Authority
- 14:00, 4 March 2020 (diff | hist) N Higher-risk residential buildings (Redirected page to Higher risk residential buildings) (top)
- 13:59, 4 March 2020 (diff | hist) N Building a Safer Future, Independent Review of Building Regulations and Fire Safety: Final Report (Redirected page to Hackitt review of the building regulations and fire safety, final report) (top)
- 13:58, 4 March 2020 (diff | hist) N Higher risk residential buildings (Created page with "Building a Safer Future, Independent Review of Building Regulations and Fire Safety: Final Report (the Hackitt review) published in 2018 following the Grenfell Tower Fire defined...")
- 13:43, 4 March 2020 (diff | hist) Initial cost appraisal for design and construction
- 13:41, 4 March 2020 (diff | hist) m Megacity (Reverted edits by [IP address hidden] (talk) to last revision by Designing Buildings)
- 13:31, 4 March 2020 (diff | hist) Featured articles and news
- 13:27, 4 March 2020 (diff | hist) Articles required
- 13:25, 4 March 2020 (diff | hist) Articles required
- 13:22, 4 March 2020 (diff | hist) Records on design and construction projects
- 13:20, 4 March 2020 (diff | hist) N Records on design and construction projects (Created page with "Are you looking for: * Historic environment records. * Building Control Performance Standard 7: Communications and records. * Site records and registers. [[Category:Definitions...")
- 13:18, 4 March 2020 (diff | hist) N Plan, Do, Check, Act (Redirected page to Plan, Do, Check, Act (PDCA)) (top)
- 10:47, 4 March 2020 (diff | hist) Non payment in the construction industry
- 10:25, 4 March 2020 (diff | hist) Consent to spend
- 10:13, 4 March 2020 (diff | hist) Cart away
- 09:40, 4 March 2020 (diff | hist) News from the web
- 09:37, 4 March 2020 (diff | hist) News from the web
- 09:29, 4 March 2020 (diff | hist) News from the web
- 09:27, 4 March 2020 (diff | hist) 37% of SMEs suffer mental health problems due to pay issues
- 09:27, 4 March 2020 (diff | hist) N File:Hourglass-2910951 290.png (source: https://pixabay.com/photos/hourglass-clock-time-period-hours-2910951/) (top)
(Latest | Earliest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.

















