Last edited 18 Dec 2024

Articles required

This is a list of articles that are needed on Designing Buildings. When you have finished an article, delete it from the list.

  1. ACM Cladding Remediation fund.
  2. Additive manufacturing.
  3. Agrisolar.
  4. Amendment notice
  5. Automatic alignment features.
  6. bin store.
  7. Biorock.
  8. Biomass gasification.
  9. Brick and flint diaper.
  10. Building Act 1984.
  11. Building Bulletins.
  12. Calculate.
  13. cavity fire barrier.
  14. Ceiling panels.
  15. Cold store.
  16. Conference hall.
  17. Concert hall.
  18. Contracts for Difference scheme. and strike price.
  19. Co-operative.
  20. Crops.
  21. cyber-physical systems.
  22. Cyclopean masonry.
  23. Cultural preservation.
  24. Dehydration.
  25. Dougong
  26. Difference between hydraulic and non-hydraulic lime
  27. Earth bag construction.
  28. Earth cellar.
  29. Ethylbenzene.
  30. Energy Recovery Ventilation (ERV)
  31. Engineering symbols.
  32. Environmental cost.
  33. Environmental stewardship.
  34. Expand deemed discharge with details of the provisions.
  35. Expo.
  36. Exhibition hall.
  37. Fail safe.
  38. Fail secure.
  39. Financing structure options
  40. Finite Element Analysis (FEA)
  41. First-mile
  42. Fivepoint estimate.
  43. Flow indicator controller. (FIC)
  44. Formaldehyde.
  45. Formaldehyde-free.
  46. Functionalism (redirects to form follows function expand historically)
  47. Gothic Brick / Brick Gothic
  48. Harappan architecture.
  49. Harbour.
  50. Heat sink radiator.
  51. Heat transfer coefficient (redirects to U value).
  52. Height of the Plane of Collimation method (surveying)
  53. Hexabromocyclododecane (HBCD)
  54. Home Upgrade Grant (HUG).
  55. Housing shortage (needs updating urgently)
  56. Hypertufa (redirict to Tufa and tuff needs more on use in lightwegiht conc)
  57. Illusion.
  58. Incidental use
  59. Industrialisation
  60. Industry 4.0.
  61. Inland seas
  62. Instrumentation Society of America (ISA)
  63. Integrated thermal collar
  64. Integration Capability
  65. Inter alia.
  66. Investment decision
  67. Key
  68. Lakes
  69. Larder (redirects)
  70. Last-mile
  71. Lido
  72. Light Expanded Clay Aggregate
  73. Living lab.
  74. Loan security valuation
  75. Local sites (currently redirect to section of designated areas)
  76. log cabin.
  77. Log construction.
  78. Loss of profit
  79. Machine learning.
  80. Marine protected areas (currently redirect to section of designated areas)
  81. Masterplanner
  82. Mechanics
  83. Mild steel.
  84. Misinformation
  85. Micromobility.
  86. Mobile technology
  87. Mobile home.
  88. Mural.
  89. NASA
  90. national association of construction frameworks.
  91. Ocean thermal energy conversion
  92. Orphanages.
  93. Original Equipment Manufacturer (ODM)
  94. Out to out and in to in estimating method.
  95. Oxygen
  96. Packaging (of products)
  97. Panel.
  98. Phenomenon
  99. Physical asset
  100. Physical environment
  101. Piping & Instrumentation Diagrams (P&IDs)
  102. Planning due diligence investigations
  103. Political agreements
  104. Politics
  105. Potato Hole
  106. Principle contractor (BS and CDM)
  107. Principle designer (BS and CDM)
  108. process flow diagrams (PFDs)
  109. Project Acceleration in a Controlled Environment (PACE)
  110. Project Definition Rating Index CII (PDRI)
  111. Prototyping.
  112. Public Sector Geospatial Agreement (PSGA)
  113. Public transport
  114. Public Affairs
  115. Public art.
  116. Purchase
  117. Quay
  118. Renaissance
  119. Restrictors
  120. Roof terrace.
  121. Salt lakes
  122. SAP 10.2 (to be adopted in June 2022)
  123. Seas.
  124. Seastead.
  125. SELECT
  126. Separate articles about fees for different professions (project manager, engineer etc)
  127. Service unit estimating method.
  128. Service economy
  129. Shelf / shelving
  130. Sight size
  131. Site access
  132. Site direction
  133. Site history
  134. Site operating procedures
  135. Smart contracts - improve
  136. Soundproofing
  137. Specialist consultants
  138. Square
  139. Stage
  140. Stagflation
  141. Standard method for assessing local housing need
  142. Standard symbols.
  143. Static electricity
  144. Street art.
  145. Structural integrity
  146. Structural member
  147. Substitutes
  148. Supermaket
  149. Surface
  150. Symbols on architectural drawings (add more)
  151. Temporary planning.
  152. Thermawood
  153. Thermal / solar / optical reflectivity (GH to write)
  154. The Institute of Materials, Minerals and Mining (IOM3).
  155. Toxic
  156. Toxicity
  157. Timber construction
  158. Trailer.
  159. Trailer park.
  160. Train
  161. Training
  162. Tram / street car
  163. Transport infrastructure
  164. Types of roof (add articles of those types not hyperlinked)
  165. Types of key
  166. Types of lock.
  167. Underground obstructions
  168. Update London plan and spg’s - improve
  169. Vapour
  170. Variable frequency drives (VFDs)
  171. Viaduct.
  172. Victorian
  173. Visual inspection
  174. Wall Tiles
  175. Weather migration
  176. WHO
  177. Whole building heat loss coefficient
  178. Whole building heat transfer coefficient
  179. Write about more products
  180. Zone (BIM)

See also lists in:

  • Typologies.
  • Common arrangement of work sections classification
  • Construction industry acronyms
  • English architectural stylistic periods
  • Architectural styles

Comments

[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.


Designing Buildings Anywhere

Get the Firefox add-on to access 20,000 definitions direct from any website

Find out more Accept cookies and
don't show me this again