Vacant possession
When property is sold, leased or vacated, it is common that agreements require that ‘vacant possession’ (VP) is given so that the property is physically and legally fit for occupation.
This generally means that:
- The property must be empty of people.
- The property must be empty of chattels (moveable objects such as furniture or substantial quantities of rubbish).
- No other parties have the right or ability to occupy the property (for example, under a lease or license).
- No other parties have the right to possess the property (for example, under certain circumstances, a right to possession under a compulsory purchase order).
Vacant possession is generally an express term of agreements, but under certain circumstances it may be implied.
There are exceptions to the requirement for vacant possession, for example if it has not been possible to hand-over keys it may be permitted for security guards to remain on the premises, or if remaining chattels do not interfere with the use of the property.
There may be a requirement to remove fixtures as well as chattels, however, failure to do so will not constitute failure to give vacant possession.
Failure to give vacant possession may constitute a breach of contract, which might result in termination of the contract, an application for specific performance, loss of deposit, and / or a claim for damages. It can also be an obstacle to a break clause in a lease, leaving the tenant in possession of the premises and so with a continuing liability to pay rent.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















