Using robots to close the gap between designing and making
The construction industry’s approach to design for manufacture and assembly is to use remote off-site factories. Andrew Watts of Newtecnic says greater use of robotics and local, flexible ‘construction laboratories’ is a better way.
Contents |
[edit] Introduction
The conventional approach to design for manufacture and assembly (DfMA) in construction is to design standard components and then have them made in remote factories to be delivered and assembled on-site.
However, the opportunity now exists for the construction industry to deploy the very latest technology and take a lead in manufacturing using local ‘construction laboratories’. These temporary factories would employ local skilled craftspeople, use locally sourced materials and deploy very advanced production machinery to achieve mass customisation.
Unlike single-purpose DfMA factories, that require years of operation to turn a profit; small, flexible and efficient manufacturing cells are easy to scale through the building cycle. This means that the right equipment will always available to match current needs.
Furthermore, as construction and maintenance robots become more advanced, they will increasingly interact with the construction laboratories; generating, checking, moving and installing both new and replacement building parts.
[edit] Robot-friendly design
Projects that Newtecnic is currently engineering are planned to deploy construction laboratories from the earliest stages of construction. They are also being designed with future robotics in mind.
For example, we anticipate that inspection, monitoring and precise measurement of normally concealed areas behind panels and within a completed building’s fabric will be executed by small flying drones and robots equipped with lidar and cameras. These will feed data back to the building’s cloud-hosted digital twin.
High-resolution building and system performance data will then be shared with, and coupled to, the on-site construction lab equipped with three-dimensional printers which fabricate components that perfectly fit the structure.
[edit] Metro facade project
A recent example is the Zaha Hadid designed facade of the King Abdullah Financial District (KAFD) metro station in Saudi Arabia, part of the $22.5 billion Riyadh metro project due for completion in 2021.
We have engineered the concrete composite facade as a modular cassette system suitable for future robot access, maintenance and replacement. We envisage that people and robots will work together cleaning, maintaining and updating the facade over the next 60 years.
There will be a construction laboratory on site using additive manufacturing to make replacement facade panels from the latest materials. And each new component will fit perfectly because it is developed from data collected using Lidar scans from the as-built structure.
[edit] New methods reduce risk
Industry players and stakeholders are perhaps mistaken in the belief that new methods and technologies present increased risk. In fact, the opposite is true because by using technology it is possible to reduce risk while creating more imaginatively conceived buildings at lower cost that use less energy, are more durable and look better.
They also take less time to make and, on completion, appear effortless. This seemingly impossible list of advantages has been proven across the world where, in partnerships with developers, architects and engineers, collaboration over data reveals absolute truths about buildings.
This article was originally published here by ICE on 23 Aug 2018. It was written by Andrew Watts.
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.