The Town and Country Planning (General Permitted Development) Order 1995 permits certain types of development without needing to seek planning permission from the local planning authority. These are known as ‘permitted developments’.
Schedule 2 of the Order, Part 4: Temporary buildings and uses, permits:
- Class A ‘…provision on land of buildings, moveable structures, works, plant or machinery required temporarily in connection with and for the duration of operations being or to be carried out on, in, under or over that land or on land adjoining that land.’
- Class B ‘…use of any land for any purpose for not more than 28 days in total in any calendar year, of which not more than 14 days in total may be for the purposes referred to in paragraph B.2 (the holding of a market, motor car and motorcycle racing including trials of speed, and practising for these activities), and the provision on the land of any moveable structure for the purposes of the permitted use.’
However, Class A developments are not permitted for mining operations, or if planning permission is required for those operations but is not granted or deemed to be granted. In addition, ‘…any building, structure, works, plant or machinery permitted by Class A shall be removed, and, any adjoining land on which development permitted by Class A has been carried out shall, as soon as reasonably practicable, be reinstated to its condition before that development was carried out.’
Class B developments are not permitted if:
- The land in question is a building or is within the curtilage of a building.
- The use of the land is for a caravan site.
- The land is, or is within, a site of special scientific interest and the use of the land is for:
- The holding of a market.
- Motor car and motorcycle racing including trials of speed, and practising for these activities.
- Other motor sports.
- Clay pigeon shooting.
- Any war game.
- The use of the land is for the display of an advertisement.
[edit] Related articles on Designing Buildings
- Approved documents.
- Building regulations.
- Building regulations exemption for temporary buildings.
- Caravan Sites and Control of Development Act 1960.
- Inflatable building.
- Live event production.
- Modular buildings.
- Modular buildings in the educational sector.
- Permitted development.
- Planning permission.
- Temporary.
- Temporary building.
- Temporary demountable structures.
- The history of fabric structures.
- WikiHouse.
Featured articles and news
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.