The dripline is the guide measurement used to prevent unnecessary damage to trees during construction works. It is defined as the outermost circumference of the tree’s canopy, from which water drips onto the ground. The ‘dripline area’ is taken to include the soil and roots that lie within that circumference.
It is crucial for the stability and health of a tree that the dripline area is ‘off limits’ from any construction activity. It may be necessary to erect a fence around the dripline or, if possible, further out around groups of trees so as to prevent their roots from being damaged by construction plant, or by works such as excavation, soil compaction or consolidation. Fences should remain in place until all construction work is complete, including the final grading and smoothing of the site.
If work inside the dripline is unavoidable, only hand tools should be used. Where possible, tunnels should be excavated beneath the root system as opposed to trenching. Other measures that can be adopted to avoid undue damage include:
- Using porous paving materials such as brick or flagstone rather than concrete or asphalt.
- Not raising the grade of the soil inside the dripline by more than a few inches.
- Not lowering the grade of the soil inside the dripline by more than 2 inches.
- Not piling soil or construction materials inside the dripline, even for a short period of time.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
An introduction to WERCS and WEEE responsibilities
Dealing 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.