Enforcement activity
Housing statistics and English Housing Survey, glossary, published by the Department for Levelling Up, Housing and Communities in 2019, states: ‘Local planning authorities have discretionary powers to take formal enforcement action if, in their view, an unacceptable breach of planning control has occurred. Where it is necessary to stop a breach immediately, the authority may issue a Temporary Stop Notice. This will halt development for 28 days while the alleged breach is investigated and further enforcement action is considered, without the need for the authority to issue an associated enforcement notice. The authority may issue an Enforcement Notice requiring the alleged breach to be remedied. If an authority considers that any activity alleged in an Enforcement Notice should cease before the end of the specified compliance period, they may serve a Stop Notice prohibiting continuation of that activity. Where conditional planning permission has been granted for a development of land and there has been a failure to comply with one or more of the conditions, an authority may serve a Breach of Condition Notice on any person who is carrying out or has carried out development, or anyone having control of the land, requiring compliance with the conditions specified in the notice.’
See also: Planning enforcement powers
[edit] Related articles on Designing Buildings
- Avoiding planning permission pitfalls.
- Development management.
- Enforcement notice.
- How long does it take to get planning permission.
- How long does planning permission last.
- Listed buildings.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning enforcement powers.
- Planning obligations.
- Planning permission.
- Retrospective planning application.
- Stop notice.
- Temporary stop notice.
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.