BMS v BEMS
The terms ‘Building Management System’ (BMS) and ‘Building Energy Management System’ (BEMS) are sometimes used as if they are interchangeable, however their specific meanings are different.
Building Management Systems are integrated, computerised systems used to monitor and control a wide range of building systems, which might include fire, smoke detection and alarms, motion detectors, CCTV, security and access control, lifts and so on, as well as systems such as lighting and HVAC (heating, ventilation and air conditioning).
For more information see Building Management Systems
Building Energy Management Systems are integrated, computerised systems used to monitor and control specific energy-related building services plant and equipment, which will typically include HVAC systems, lighting and power systems.
For more information see Building Energy Management Systems
[edit] Related articles on Designing Buildings Wiki
- Air conditioning.
- Automated blinds.
- BACS building automation controls - the information revolution.
- Building Automation and Control System BACS.
- Building energy efficiency - is building automation the answer?
- Building energy management systems (BEMS) for data centres.
- Building management systems
- Building services.
- Building services engineer.
- Commercial building automation market.
- Cyber threats to building automation and control systems.
- Data centres.
- Energy management and building controls.
- Energy management in the built environment: A review of best practice.
- Global BACS market resilience.
- Global building energy management systems market.
- HVAC.
- Internet of things.
- Mechanical, electrical and plumbing MEP.
- Smart buildings.
- Smart meter.
- Smart technology.
- US Smart Connected HVAC in Commercial Buildings Study 2017.
- Wireless vs wired building energy management system.
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.