Self-build home: Confirm appointment of the supplier to fabricate and install the kit house
As the kit house supplier has already been selected, this appointment should be a relatively straight-forward process of confirming the purchase and agreeing the programme for the works.
However, it is important to be certain what is included in the contract and what may need to be procured separately, such as:
- Providing appropriate services to the site (water, electricity, gas, telephone, drainage and so on).
- Providing a foundation slab.
- Fitting out the interior.
- Landscaping the site and providing access to the house (this might include; paths, drives, ramps, steps and so on).
Some of these works will be required before the kit house can be installed. Any works that remain outside the main contract will have to be carefully co-ordinated to ensure the programme is properly synchronised and there are no delays. See Appoint a range of contractors and suppliers to construct the home for more information about organising separate trade contractors and suppliers.
The supply contract for the kit house should include information about:
- Start and completion dates and key dates for works outside the contract.
- Stage payments.
- Professional indemnity insurance, public liability insurance and works insurance.
- Warranties. Both for the fabric of the building and any fixtures and fittings.
- Toolkits and operating and maintenance manuals.
- Spares.
- The fixtures and fittings included; such as lamps, blinds, white goods, cupboards, floor coverings, security systems and so on.
- Other specific inclusions and exclusions.
- Certificates.
NB Kit houses may qualify to reclaim the VAT paid on eligible building materials and services. See VAT refunds on self-build homes for more information.
NB Self-build clients are ‘domestic clients’ for the purposes of the Construction (Design and Management) Regulations (health and safety regulations generally referred to as the 'CDM Regulations'), and so the client's duties under the regulations will fall to the contractor on a project where there is only one contractor or to the principal contractor on a project where there is more than one contractor. However self-build clients can attract health and safety duties under Part 4 of the Regulations if they control the way in which construction work is carried out. See CDM for self-builders and domestic clients for more information.
Featured articles and news
Conservation and transformation
Reading Ruskin’s cultural heritage. Book review.
Renovating Union Chain Bridge.
AI tools for planning, design, construction and management
A long, continually expanding list, any more to add?
Robots in the construction industry
From cultural characterisations to construction sites.
Empowering construction with AI integration
New horizons with a human touch.
Key AI related terms to be aware of
With explanations from the UK government.
A Better Hiring Toolkit for construction
Tooling up to hire under best practice standards in the sector.
Recharging Electrical Skills in Wales
Step by step collaborative solutions.
Ireland budget announcement 2025
CIOB responds with positivity, criticism and clarity.
The continued ISG fall out, where to go?
Support for ISG contractors, companies and employees.
New HES national centre for traditional building retrofit
Announced as HES publishes survey results which reveal strong support for retrofit.
Retrofit of Buildings, a CIOB Technical Publication
Expected to become one of the largest activities in the global construction industry.
Scope determination appeals and the Building Safety Act
Process explained following release of appeals guidance.
The ECA industry focus video channel
Keeping update with the industry session by session.
Over 25 recorded informations sessions freely available.
AT Awards 2024 ceremony East London October 25th.
Revisiting the AT community at the 2023 awards evening.