Find potential plots.
Finding a suitable plot (or property for conversion) is one of the biggest challenges for self-builders as demand generally exceeds supply. It might involve:
- Advertising.
- Registering with estate agents, land agents and local authorities.
- Using online search sites such as PlotBrowser and Rightmove.
- Offering a finder’s fee to property professionals.
- Joining a self-build forum.
- Considering land or property owned by family members.
- Approaching owners of land designated for residential use in local development plans.
- Analysing aerial photography and large-scale maps which might reveal potential infill plots, such as; large back gardens, waste ground or brownfield sites.
- Poorly built, low-value properties that might be worth purchasing for their land value.
Be aware that there are a number of scams that attempt to exploit people looking for self-build plots. Always keep in mind the phrase ‘buyer beware’. If it sounds too good to be true, then it probably is.
Assess potential plots.
In considering different potential plots, it is important to assess:
- Compatibility with the requirements set out in the brief.
- The likelihood that planning permission will be granted, including possible objections from interested parties. Some sites are offered with outline planning permission, and without this, or detailed planning permission, the site may not be a developable plot. Proceeding with such a plot is taking a risk that the vendor did not consider worthwhile. However, plots with permission in place are likely to be more expensive.
- The date of any planning consent. Construction of a development must begin within three years of a planning approval, and reserve matters applications (applications giving details following an outline planning permission) must be made within three years of the outline approval.
- The planning history of the plot.
- Uses of adjoining land.
- Future developments planned in the area that might impact on the proposed plot.
- The connectivity of the location in terms of; transport links, access to schools, shops and other amenities.
- The exact legal boundaries of the plot.
- Ease of access onto the plot, both for construction vehicles and once the home is complete.
- Site orientation relative to the sun, views, prevailing wind and so on.
- Land topography, levels and flood risk.
- Availability or proximity of utilities. The cost of bringing utilities to a site will depend on the distance from existing connections and can be very expensive.
- Price in relation to the budget, including stamp duty land tax.
- Legal complexities, such as listed buildings, conservation areas, boundary disputes, party walls, easements, restrictive covenants, tree preservation orders and so on. See Technical due diligence for more information.
- The presence of protected species such as great crested newts or controlled species such as Japanese knotweed which can delay developments and incur significant costs.
- Obstructions such as old foundations which may need to be removed.
- Whether there is any contaminated land.
- The suitability of ground conditions for supporting a building and for landscaping.
- The possible layout of accommodation on the site.
- The likely value of the completed development.
Featured articles and news
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.