The Security Overlay (April, 2023) was developed by the National Protective Security Authority (NPSA), RIBA and Police Crime Prevention Initiatives (CPI). It is intended for those involved in the safe and secure design, construction and operation of any building.
The key benefits to the different members of any project adopting this overlay go beyond ensuring that a building is safer for its occupant:
- For project teams, it considers the threats and determines the project-specific security risks from the outset using the security risk assessment, leveraging security as an enabler for better outcomes on a wide range of topics, from operations to user safety.
- For clients, ensuring the security risk assessment is undertaken in advance of, or as part of, the briefing process informs the security requirements that will drive confidence that effective measures are in place before the building is occupied, and mitigate against expensive retrofitting.
- For architects and design teams integrating security measures into the design as early as possible, including physical and technological features, leverages the expertise of the wider security landscape and key stakeholder concerns to deliver a robust security strategy.
- For contractors delivering the project in line with the security strategy, this brings a clearer understanding of why these measures are proposed and provides transparency of any risks for consideration during the construction phase.
- For operators, they receive a building that is aligned with the security plan for effective day-to-day management that keeps occupants and visitors safe and avoids the need for any additional specialists, unsightly security measures, and associated costs
For further information and to download the Security Overlay to the RIBA plan of work visit here
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.