Security Overlay
The Security Overlay (April, 2023) was developed by the National Protective Security Authority (NPSA), RIBA and Police Crime Prevention Initiatives (CPI). It is intended for those involved in the safe and secure design, construction and operation of any building.
The key benefits to the different members of any project adopting this overlay go beyond ensuring that a building is safer for its occupant:
- For project teams, it considers the threats and determines the project-specific security risks from the outset using the security risk assessment, leveraging security as an enabler for better outcomes on a wide range of topics, from operations to user safety.
- For clients, ensuring the security risk assessment is undertaken in advance of, or as part of, the briefing process informs the security requirements that will drive confidence that effective measures are in place before the building is occupied, and mitigate against expensive retrofitting.
- For architects and design teams integrating security measures into the design as early as possible, including physical and technological features, leverages the expertise of the wider security landscape and key stakeholder concerns to deliver a robust security strategy.
- For contractors delivering the project in line with the security strategy, this brings a clearer understanding of why these measures are proposed and provides transparency of any risks for consideration during the construction phase.
- For operators, they receive a building that is aligned with the security plan for effective day-to-day management that keeps occupants and visitors safe and avoids the need for any additional specialists, unsightly security measures, and associated costs
For further information and to download the Security Overlay to the RIBA plan of work visit here
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.

















