Security Overlay
The Security Overlay (April, 2023) was developed by the National Protective Security Authority (NPSA), RIBA and Police Crime Prevention Initiatives (CPI). It is intended for those involved in the safe and secure design, construction and operation of any building.
The key benefits to the different members of any project adopting this overlay go beyond ensuring that a building is safer for its occupant:
- For project teams, it considers the threats and determines the project-specific security risks from the outset using the security risk assessment, leveraging security as an enabler for better outcomes on a wide range of topics, from operations to user safety.
- For clients, ensuring the security risk assessment is undertaken in advance of, or as part of, the briefing process informs the security requirements that will drive confidence that effective measures are in place before the building is occupied, and mitigate against expensive retrofitting.
- For architects and design teams integrating security measures into the design as early as possible, including physical and technological features, leverages the expertise of the wider security landscape and key stakeholder concerns to deliver a robust security strategy.
- For contractors delivering the project in line with the security strategy, this brings a clearer understanding of why these measures are proposed and provides transparency of any risks for consideration during the construction phase.
- For operators, they receive a building that is aligned with the security plan for effective day-to-day management that keeps occupants and visitors safe and avoids the need for any additional specialists, unsightly security measures, and associated costs
For further information and to download the Security Overlay to the RIBA plan of work visit here
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..