Section 184 agreement - vehicle crossings over footways and verges
Section 184 of the Highways Act 1980 provides that a developer will need to enter an agreement for the construction of, or alterations to, any site access or accesses. It relates specifically to accesses where the work being done is all that is required to enable the development, or if the work needs to be done before the main works can proceed under a Section 38 agreement (adoption of highways) or a section 278 Agreement (allowing a developer to carry out works to a public highway).
The Local Highway Authority reviews and approves the agreements, and appropriate fees will be payable to them. A commuted sum may also be required for the Highway Authority to be able to maintain the works once they have been completed, usually for a fixed period between 10 and 25 years.
An agreement is necessary when a developer plans to construct or alter any site access or accesses to a public highway that is of a higher specification than something simple such as a dropped footway or verge crossing.
The scope of a Section 184 Agreement can be extended, in some instances, to cover additional minor works, such as relaying a short length of kerbing on either side of a new access, provision of street lighting for an access, or the re-positioning of a gully.
Section 38 agreement - adoption of highways, clauses can be incorporated into a Section 184 agreement where it is desirable that the highway contain both the land that is being dedicated as public highway by the developer as well as the access works, such as providing visibility splays.
As Section 184 does not provide for the formal entering into of agreements between a developer and Highway Authority, an Agreement should have regard to the following subsections:
- Subsection 3: The owner or occupier of land can be served notice by the Authority for the execution of the works.
- Subsection 7: The Authority can recover from the owner/occupier all expenses that are reasonably incurred from the works.
- Subsection 9: Any person named in a notice may offer to execute the works themselves in accordance with approved plans.
- Subsection 10: If subsection 9 is followed but the developer fails to comply with their offer, then the Authority can execute the works and recover expenses.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.