SSE begins BESS construction in North of England
ECA Member SSE Energy has begun building a Battery Energy Storage Site (BESS) in West Yorkshire.
The project, which is located at the company’s former Ferrybridge coal-fired power station, is being developed in conjunction with battery technology supplier Sungrow Power Supply and construction partner OCU Services. The site will be able to provide the grid with 300MWh of flexible capacity for two hour periods. Construction is expected to be complete by the end of 2024.
Richard Cave-Bigley, director of solar and battery at SSE Renewables, said: “We’re breaking new ground with our first battery at an existing SSE site. Ferrybridge used to be a coal site; but today we’ve evolved to building a 150MW flexible battery asset that can store the energy we need to help get to net zero.”
Lewis Li, president of Sungrow Europe, added: “Sungrow is proud to supply our liquid cooled energy storage system, the PowerTitan, to this landmark project. We are excited for what is to come with our partnership with SSE Renewables as we work towards maximising the profitability for the project with cutting-edge products and services.”
The Ferrybridge project will become SSE Renewables’ second battery storage project in delivery with the company already constructing a 50MW project in Salisbury.
ECA works closely with its Members, industry partners and Government to help Britain transition to Net Zero Carbon. We produce regular guidance notes, technical bulletins, and industry updates to keep Members at the forefront of the Net Zero transition. Learn more here.
This article appears on the ECA news and blog site as "SSE begins BESS construction in North of England" dated August 24, 2023.
--ECA
[edit] Related articles on Designing Buildings
- Battery storage
- Battery energy storage systems with grid-connected solar photovoltaics BR 514.
- DC isolators for photovoltaic systems (FB 68).
- Domestic micro-generation.
- Energy price crisis: ECA calls for energy levy reform.
- Energy storage - the missing piece?
- Energy storage for buildings.
- Energy storage in buildings - a technology overview BG73 2018.
- Flow battery.
- Fly wheel.
- Fuel cell.
- Graphene batteries.
- Lead-acid battery.
- Lithium-ion battery.
- The use of batteries to store electricity for buildings.
- Why the UK needs to support emerging tech like energy storage.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.

















