Approved document 7
The building regulations establish standards to be achieved in the construction of buildings. Approved documents provide guidance for how the building regulations can be satisfied in common situations.
Approved Document 7: materials and workmanship, supports regulation 7 of the building regulations, requiring the carrying out building work using the proper materials and in a workmanlike manner.
The latest edition, updated to reflect changes in the Construction Products Regulations, was published on 3 January 2013 and came into force on 1 July 2013. It applies to building works in England.
Regulation 7 requires that building work is carried out:
- With adequate and proper materials which:
- Are appropriate for the circumstances in which they are used,
- Are adequately mixed or prepared, and
- Are applied, used or fixed so as adequately to perform the functions for which they are designed; and
- In a workmanlike manner.
The approved document's contents include:
- Summary.
- Continuing control.
- Interaction with other legislation.
- Regulation 7 of the Building Regulations.
- Performance and limitations.
- Performance.
- Limitations.
- Ways of establishing the fitness of materials.
- Short-lived materials.
- Materials susceptible to changes in their properties.
- Section 2: Workmanship.
- Ways of establishing the adequacy of workmanship.
Following the Grenfell Tower Fire, a decision was taken to ban combustible materials in the cladding for buildings over 18m in height. The following change to approved document 7 came into force on 21 December 2018.
| The Building Regulations restrict the use of combustible materials in the external walls of certain buildings over 18m in height. Refer to regulation 7(2) of the Building Regulations and to Approved Document B: volume 2, part B4 for details. |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.