Prime cost price
According to NRM 2, RICS new rules of measurement, Detailed measurement for building works, published by the Royal Institution of Chartered Surveyors (RICS) in April 2012:
|
Where the exact type of product or component cannot be specified, an estimated price for the product or component shall be given in the description as a prime cost price (PC price). State, for example, ‘Allow the PC price of £x per thousand delivered to site’, ‘Allow the PC price of £y per m2 delivered to site’, or ‘Allow £z each delivered to site’. Unless specifically stated otherwise in the bill of quantities or in these rules, the contractor shall be deemed to have allowed for all items listed in paragraph [IP address hidden] in his or her priced rate for each building component/item incorporating a PC price. PC prices shall exclude any allowance for the main contractor’s overheads and profit, which are dealt with separately. |
Paragraph [IP address hidden] refers to:
- (1) labour and all costs in connection therewith;
- (2) materials and goods together with all costs in connection therewith;
- (3) assembling, installing, erecting, fixing or fitting materials or goods in position;
- (4) plant and all costs in connection therewith;
- (5) waste of goods or materials;
- (6) all rough and fair cutting unless specially stated otherwise;
- (7) establishment charges; and
- (8) cost of compliance with all legislation in connection with the work measured including health and safety, disposal of waste and the like.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.





















