The Passivhaus Overlay (February, 2023) was jointly commissioned by the Passivhaus Trust and the RIBA . It sets out key actions and processes needed at each work stage for clients and project teams wishing to deliver Passivhaus certified projects. It outlines key differences between Passivhaus workflows and 'conventional' project approaches, and aims to help clients and project teams avoid risk and make informed, intelligent decisions at the right time to achieve streamlined and cost effective certification.
The guidance draws on the expertise of experienced Passivhaus designers and certifiers and synthesises the lessons learned from delivering projects across scales and typologies to highlight crucial windows of opportunity and workflow interactions. Also highlighted are the synergies afforded by the Passivhaus design process in reducing whole life carbon the RIBA 2030 Climate Challenge targets.
To download the Passivhaus Overlay to the RIBA plan of work visit here
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.