A dispute in the Party Wall sense of the word need not be much of a dispute at all; even if the Act says it is. Under the Party Wall etc. Act 1996, if an adjoining owner doesn’t consent within 14 days of receiving notice of the proposed works then the parties are deemed to be “in dispute”. The way that disputes under the Act are resolved is by each of the owners appointing a surveyor and those surveyors agreeing the terms of Party Wall Agreement.
Even if the adjoining owner decides to concur with their neighbour’s choice of surveyor as “agreed surveyor” (normally a good decision for minor works) there is still a “dispute” to be resolved so an award must be drawn up and served on the owners.
In effect, what an adjoining owner is saying when they instigate a dispute is that they would like to have their interests protected by a person who understands construction matters and is familiar with the procedures under the Party Wall Act.
It could not be easier for an adjoining owner to instigate a dispute; they need do nothing at all. If Party Wall Notices and Notices of Adjacent Excavation are not consented within 14 days of being received then a DISPUTE has arisen.
The adjoining owner may appoint a surveyor (or concur in the appointment of an agreed surveyor) within the 14 day period but they needn’t rush their decision. Once the 14 days have elapsed they must be sent a follow-up letter asking them to appoint a Party Wall Surveyor within 10 days or risk one being appointed on their behalf by the building owner (the party planning the work). If a building owner does gain the right to appoint a surveyor on behalf of their neighbour that cannot be the same surveyor that they are using; an Agreed Surveyor cannot be appointed unless both owners confirm that appointment in writing.
Once a dispute has arisen both the building owner and the adjoining owner change from being “clients” to “appointing owners” - the terminology reinforces the surveyor’s duty to be impartial. A surveyor can serve notice on behalf of their client because at that stage it is not known whether the adjoining owner will consent or not. If they consent there will be no award and no need for a party wall surveyor.
[edit] Related articles on Designing Buildings Wiki
- 10(4) Party Wall Surveyor Appointments.
- Adjoining buildings definition.
- Adjoining owner.
- Fence.
- Institute of party wall surveyors.
- Line of junction notice.
- Party structure notice.
- Party Wall Act.
- Party wall surveyor.
- Preventing wall collapse.
- Responsibility for boundary features.
- Right of support.
- Trespass.
- Wall types.
- What approvals are needed before construction begins.
- Who Pays for Party Wall Surveyor's Fees?
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.